Article|
November 1, 1955
Analytical Review: The Pathogenesis of the Hemorrhagic State in Radiation Sickness: A Review Free
A. C. UPTON
A. C. UPTON
Biology Division, Oak Ridge National Laboratory, Oak Ridge, Tennessee.
Search for other works by this author on:
Blood (1955) 10 (11): 1156–1163.
Article history
Submitted:
March 11, 1955
Accepted:
June 30, 1955
Citation
A. C. UPTON; Analytical Review: The Pathogenesis of the Hemorrhagic State in Radiation Sickness: A Review. Blood 1955; 10 (11): 1156–1163. doi: https://doi.org/10.1182/blood.V10.11.1156.1156
Download citation file: