Arsenic had been used in treating malignancies from the 18th to mid-20th century. In the past 3 decades, arsenic was revived and shown to be able to induce complete remission and to achieve, when combined with all-trans retinoic acid and chemotherapy, a 5-year overall survival of 90% in patients with acute promyelocytic leukemia driven by the t(15;17) translocation-generated promyelocytic leukemia–retinoic acid receptor α (PML-RARα) fusion. Molecularly, arsenic binds thiol residues and induces the formation of reactive oxygen species, thus affecting numerous signaling pathways. Interestingly, arsenic directly binds the C3HC4 zinc finger motif in the RBCC domain of PML and PML-RARα, induces their homodimerization and multimerization, and enhances their interaction with the SUMO E2 conjugase Ubc9, facilitating subsequent sumoylation/ubiquitination and proteasomal degradation. Arsenic-caused intermolecular disulfide formation in PML also contributes to PML-multimerization. All-trans retinoic acid, which targets PML-RARα for degradation through its RARα moiety, synergizes with arsenic in eliminating leukemia-initiating cells. Arsenic perturbs a number of proteins involved in other hematologic malignancies, including chronic myeloid leukemia and adult T-cell leukemia/lymphoma, whereby it may bring new therapeutic benefits. The successful revival of arsenic in acute promyelocytic leukemia, together with modern mechanistic studies, has thus allowed a new paradigm to emerge in translational medicine.

Arsenic is the 20th most abundant element in the earth's crust.1  It is a chemical analog of phosphorus and lies directly below P in the periodic table. A unique feature of arsenic is its extremely paradoxical abilities: it is toxic to humans, animals, and plants, but is used instead of phosphorus by a recently isolated bacterium2 ; it kills people, but saves lives; it can cause some cancers but cures others such as the acute promyelocytic leukemia (APL)3 ; it is one of the oldest drugs in the world but was progressively revived between the 1970s and 1990s, because of its striking efficacy on APL, which represented the most malignant type of acute leukemia.3  These paradoxical effects of arsenic reflect its unique metabolism and multiple properties.4  In this review, we address how arsenic rebuilds its reputation from a notorious poison to a new lease of life by mechanistic molecular and translational medicine studies.

Arsenic is the 33rd element in the periodic table and exists ubiquitously in either inorganic or organic forms, pure metallic arsenic being rarely found in nature. Arsenic occurs in 5 different valence states, +V (arsenate), +III (arsenite), +I (arsonium metal), 0 (arsenic), and −III (arsine).5  Most arsenic compounds have no smell or special taste and are white or colorless powders that do not evaporate. Arsenic gets into air when contaminated materials are burned. Inorganic arsenic occurs naturally in soils and sedimentary rocks such as minerals and ores containing copper or lead, and it occurs in combination with many other elements especially oxygen, chlorine, and sulfur. There are 3 inorganic arsenic forms, namely, red arsenic (As4S4, also known as realgar), yellow arsenic (As2S3, also known as orpiment), and white arsenic (arsenic trioxide, ATO; As2O3). ATO is made by burning realgar or orpiment.6  Organic arsenic is arsenic compounds containing carbon that can be found in nature in water, natural gas, and shale oil.5  Examples of organic arsenic are methylarsine (CH3AsH2), dimethylarsine [(CH3)2AsH], trimethylarsine [(CH3)3As], monomethylarsonic acid [CH3AsO(OH)2, MMAV], monomethylarsenous acid [CH3As(OH)2, MMAIII], dimethylarsinic acid [(CH3)2AsO(OH), DMAV], dimethylarsenous acid [(CH3)2AsOH, DMAIII], trimethylarsinic oxide [(CH3)3AsO, TMAO], tetramethylarsonium ion [(CH3)4As+, TMA+], arsenobetaine [(CH3)3As+CH2COO, AB], arsenocholine [(CH3)As+CH2 CH2OH, AC], and others.5,7-9  Darinaparsin is an organic arsenic composed of dimethylated arsenic linked to glutathione.10 

Regarding arsenic metabolism, an arsenic methyltransferase, encoded by a gene that was originally annotated as Cyt19 and subsequently As3mt, was identified in rat that catalyzes the methylation of arsenite, with S-adenosyl-L-methionine as the methyl donor.11,12  Inorganic arsenic is metabolized by a sequential process involving a 2-electron reduction of pentavalent arsenic to trivalent arsenic, followed by oxidative methylation to pentavalent organic arsenic.13,14  The postulated scheme is as follows: iAsV → iAsIII → MAsV → MAsIII → DMAsV → DMAsIII → TMAsV → TMAsIII.13-16  Of note, derivatives of MAsIII and DMAsIII are more toxic than either iAsV or iAsIII.16  Methylarsine oxide (MAsIIIO) and to a lesser extent iododimethylarsine are more potent growth inhibitors and apoptotic inducers than iAsIII in leukemia cells, and apoptosis is associated with greater hydrogen peroxide accumulation and inhibition of glutathione peroxidase activity. In vivo hepatic methylation of iAsIII may contribute to ATO-induced apoptosis but not differentiation of APL cells.15 

Arsenic is toxic to human health in that it can induce skin lesions, hemorrhagic gastroenteritis, cardiac arrhythmia, psychiatric disease, and cancers.9,17,18  Generally, inorganic arsenic species are more toxic than organic forms to living organisms, and arsenite is usually more toxic than arsenate. Exposure to ATO by ingestion of 70-80 mg has been reported to be fatal for humans.7,19  The World Health Organization set the first International Drinking Water Standard for arsenic concentration at 200 μg/L in 1958, recommended lowering the standard to 50 μg/L in 1963, and further lowered the standard to 10 μg/L in 1993.20  Yet millions of people worldwide ingest drinking water contaminated with arsenic at levels > 100 μg/L.5,7,20 

The toxicity of trivalent arsenic is related to its high affinity for the sulfhydryl groups of biomolecules such as glutathione and lipoic acid and the cysteinyl residues of many proteins and enzymes.7,21  Arsenic up-regulates glutathione-related genes and enzyme activities and binds to sulfhydryl groups.22,23  The formation of AsIII-sulfur bonds results in various harmful effects by inhibiting the activities of enzymes such as glutathione reductase, glutathione peroxidases, thioredoxin reductase, and thioredoxin peroxidase.4,7,21  Because all of these enzymes regulate cellular redox status by providing antioxidant defense, arsenic exposure leads to production of reactive oxygen species (ROS).4  Similarly, flavin enzymes such as NAD(P)H oxidase and NO synthase isozymes have been proposed to be involved in the generation of ROS associated with arsenic exposure.4  Arsenic also alters global histone H3 methylation.24  Consequently, arsenic affects many signal transduction cascades (eg, activation of the epidermal growth factor receptor [EGFR] signal pathway25 ) and activates (or inactivates) transcription factors such as activated protein-126  and nuclear factor–erythroid 2-related factor 2.27,28  Biomarkers of arsenic exposure include the total arsenic in urine,29  clastogenicity in peripheral lymphocytes, micronuclei in oral mucosa and bladder cells, and induction of heme oxygenase. A potential susceptibility biomarker is variability in arsenic metabolism, which reflects polymorphisms in the genes that encode the arsenic-metabolizing enzymes.29 

Arsenic is one of the oldest drugs in the world. It was first mentioned by Hippocrates (460-370 BC) who used realgar and orpiment pastes to treat ulcers in Western medicine. In China, arsenic pills for the treatment of periodic fever were recorded in the Chinese Nei Jing Treaty (263 BC).30  Si-Miao Sun (581-682 AD) purified a medicine composed of realgar, orpiment, and ATO in treating malaria,31  whereas Shi-Zhen Li (1518-1593 AD)32  in the Ming Dynasty described the use of ATO as a remedy for a variety of diseases in his pharmacopedia. Arsenic therapy was introduced to Europe by Avicennes (980-1037 AD) and Paracelsus (1493-1541 AD). In 1774, Lefébure introduced an arsenic-containing paste proposed to be an “established remedy to radically cure all cancers.”6  Fowler solution (1% potassium arsenite, KAsO2) was first described in 1845 and was used to treat anemia and rheumatism, psoriasis, eczematous eruptions, dermatitis herpetiformis, asthma, cholera, and syphilis. In 1865, Fowler solution was the first chemotherapeutic agent used in the treatment of leukemia that produced some transient improvement.33-35  In 1931 Forkner and Scott, at Boston City Hospital, “rediscovered” Fowler solution for the treatment of chronic myeloid leukemia (CML), and arsenicals and irradiation remained the treatment of choice until busulphan was introduced in 1953.33-35 

APL, the M3 subtype of acute myeloid leukemia (AML M3), is characterized by the accumulation of abnormal promyelocytes in blood and bone marrow, the occurrence of fibrinogenopenia and disseminated intravascular coagulation, and the specific chromosomal translocation t(15;17)(q22;q21).36-38  The t(15;17) fuses the retinoic acid receptor α (RARα) gene on chromosome 17 to the promyelocytic leukemia (PML) gene on 15q, yielding the PML-RARα fusion protein that is the key driver of APL leukemogenesis.36-38  APL was firstly described by Hillestad in 19573  and was considered at the time the most fatal type of acute leukemia.3,36,38  The past 5 decades have witnessed tremendous advances in improving APL outcome from highly fatal to highly curable (Figure 1).35,36,38,39  Although chemotherapy (anthracyclines) shines the first light of hope,40  all-trans retinoic acid (ATRA), which triggers terminal differentiation of APL cells, achieves a complete remission (CR) rate of 90%38,41-44  (and references within these articles). Although ATRA alone rarely cures APL, its combination with anthracyclines allowed a significant number of cures. ATO further prolongs survival of patients with APL, especially those with relapsed or refractory disease, and cures a number of them as a single agent. Moreover, combined use of ATRA and ATO not only markedly enhances clearance of PML-RARα transcript, but allows the 5-year overall survival (OS) to reach 91.7%38,39,45  (Figure 1). Mechanistically, both ATRA and ATO trigger catabolism of the PML-RARα fusion protein. However, ATO has no effect on APL driven by promyelocytic leukemia zinc finger (PLZF)–RARα, which is generated by t(11;17) and accounts for 1%-2% of patients with APL.46-51  Thus, the story of APL can serve as a model for the development of targeted therapies and curative approaches for malignant disease.51

Figure 1

A historical view of the treatment outcome (represented by 5-year overall survival) of APL.

Figure 1

A historical view of the treatment outcome (represented by 5-year overall survival) of APL.

Close modal

Clinical efficacy

In the early 1970s, a group from Harbin Medical University in northeastern China tested Ailing-1 containing 1% ATO and a trace amount of mercury chloride in a variety of cancers by intravenous administration. In the 1990s, Sun et al52  showed that Ailing-1 induced CR in 21 of 32 patients with APL with an impressive 10-year survival rate of 30%. The efficacy of pure ATO in treating relapsed APL was then reported by Shanghai Institute of Hematology (SIH) in 1996-1999.53,54  Shen et al54  evaluated the therapeutic effect of ATO in the treatment of 15 patients with APL at relapse after ATRA-induced and chemotherapy-maintained CR. ATO was administered intravenously at the dose of 10 mg/d. They showed that CR was achieved in 9 of 10 patients (90%) treated with ATO alone and in the remaining 5 patients with ATO in combination with low-dose chemotherapeutic drugs or ATRA. No bone marrow depression was encountered during ATO treatment.54  Niu et al53  reported that clinical CR was obtained in 8 of 11 newly diagnosed cases (72.7%) and in 40 of 47 relapsed patients (85.1%). They recommended that ATRA is used as first choice for remission induction in newly diagnosed APL cases, whereas ATO can be either used as a rescue for relapsed cases or included into multidrug consolidation/maintenance clinical trials. Furthermore, after CR achieved with the use of ATO alone, a molecular remission is obtainable in a relatively high proportion of the patients, from 72%55  to 91%56  in different multicenter studies, showing that ATO is an effective drug for APL. With the use of ATO as a single agent, a good long-term remission can be obtained, as evidenced by a 5-year event-free survival (EFS) of 69%57  to 72.7%58  in 2 recent reports (Table 1).

Table 1

Outcome of patients with APL treated with ATO-based regimens since 2006

YearAuthorNo.RegimenCR, %EFS, %*DFS, %*OS, %*
2010 Powell et al59  244 (237 standard controls) Induction: ATRA/CT; consolidation: ATRA/CT/ATO 90 80 (3 y) 90 (3 y) 86 (3 y) 
2010 Zhou et al58  19 (age ≤ 15) ATO 89.5 72.7 NR 83.9 
2010 Mathews et al57  72 ATO 86.1 69 80 74.2 
2009 Dai et al60  90 ATO/ATRA 93.3 92.2 (3 y)   
2006 Ghavamzadeh et al61  111 ATO 85.6 NR 63.7 (2 y) 87.6 (3 y) 
2008 Hu et al39  85 ATO/ATRA/CT 94.1 89.2 NR 91.7 
2007 Wu et al62  114 As4S4/ATRA or As4S4/CT   94 (4 y)  
YearAuthorNo.RegimenCR, %EFS, %*DFS, %*OS, %*
2010 Powell et al59  244 (237 standard controls) Induction: ATRA/CT; consolidation: ATRA/CT/ATO 90 80 (3 y) 90 (3 y) 86 (3 y) 
2010 Zhou et al58  19 (age ≤ 15) ATO 89.5 72.7 NR 83.9 
2010 Mathews et al57  72 ATO 86.1 69 80 74.2 
2009 Dai et al60  90 ATO/ATRA 93.3 92.2 (3 y)   
2006 Ghavamzadeh et al61  111 ATO 85.6 NR 63.7 (2 y) 87.6 (3 y) 
2008 Hu et al39  85 ATO/ATRA/CT 94.1 89.2 NR 91.7 
2007 Wu et al62  114 As4S4/ATRA or As4S4/CT   94 (4 y)  

NR indicates not reported.

*

Five years, unless otherwise indicated.

The efficacy of As4S4 in APL was also investigated. In 1995, Huang et al63  reported remarkable results of the Realgar-Indigo Naturalis Formula, in which As4S4 is the principle ingredient, in treating 60 patients with APL, including 43 newly diagnosed cases. In 2002, Lu et al64  showed that of the 129 patients with APL receiving pure As4S4,103 cases (79.8%) achieved CR. In the newly diagnosed group (19 patients), the estimated disease-free survival rates for 1 and 3 years were 86.1% and 76.6%, respectively, with a median follow-up time of 13.5 months. They further showed that in 114 patients receiving As4S4 in combination with ATRA or chemotherapy (mitoxantrone or hydroxyurea or both), the estimated 4-year disease-free survival was 94%.62 

Mechanisms of action

PML-RARα as a direct arsenic target.

That ATO exerts drastic therapeutic effects against APL, but not other subtypes of AML (including variant APL driven by the PLZF-RARα fusion), suggests a crucial link between its mechanism of action and PML-RARα, a potent transcriptional regulator that alters expression of ATRA or non-ATRA target genes.38,65-67  Indeed, it was rapidly shown that arsenic efficiently triggers the degradation of PML-RARα through its PML moiety.68-70 

The wild-type PML and the PML moiety in fusion protein harbor the RBCC domain,69,70  which contains 1 RING and 2 B boxes (B box 1 and B box 2) motifs capable of binding metal (physiologically zinc) ions, and a coiled-coil (CC) motif mediating homodimer formation.71,72 Figure 2A is a schematic representation of major domains of PML, RARα, and PML-RARα. In normal cells, PML proteins are the main components of spherical nuclear organelles designated nuclear bodies (NBs), which play a key role in regulation of apoptosis, epigenetic control of chromatin, and transcriptional expression, as well as storage/modulation of certain nuclear proteins.73-75  NB structures are disrupted in APL cells, because of formation of PML/PML-RARα heterocomplex. This yields a much larger number of tiny dots by immunofluoresence analysis, showing the disorganization of this nuclear domain.76  The ATRA and arsenic-triggered degradation process is intimately coupled to changes in PML/PML-RARα localization.46,68,70,77-79  Indeed, in ATO-treated APL cells or cells transfected with PML, PML-RARα,79  both PML-RARα and wild-type PML are quickly translocated to the nuclear matrix, sumoylated, ubiquitinated, and subsequently degraded by the proteasome. In parallel, in arsenic-treated APL cells, dots of PML-containing proteins are aggregated to form larger particles at the nuclear matrix, before their ultimate disappearance (Figure 2B) and the cells are committed to apoptosis or partial differentiation (Figure 2C).

Figure 2

Effects of arsenic on APL cells. (A) Schematic represents the structure of PML, RARα, and PML-RARα. (B) The NB4 cells were treated with 1μM ATO for indicated time points and were assessed by immunofluorescence staining with an anti-PML antibody (green). Stainings were analyzed using a Leica TCS SP5 confocal microscope equipped with a 63×/1.4 NA oil objective (Leica Microsystems). Images were processed using Leica AF lite software. (C) Arsenic induces dual effects on APL cells. The NB4 cells were treated with indicated concentration for 48 hours and stained with the Wright stain. Stainings were analyzed using an Olympus BX51 research microscope equipped with a 100×/1.30 NA oil objective (Olympus). Images were processed using Adobe Photoshop CS (Adobe Systems). Original magnification, ×1000. (D) Colocalization of PML and PML-RARα with the fluorescent organic arsenical ReAsH in NB4 cells. Images were visualized and processed using the equipment described for panel B. (E) The schematic diagram of the structure of PML RING coordinated with zinc or arsenic. (F) Predicted structure of PML RING/UBC9 complex. (G) A working model of the mechanism by which arsenic controls the fate of PML and PML-RARα.

Figure 2

Effects of arsenic on APL cells. (A) Schematic represents the structure of PML, RARα, and PML-RARα. (B) The NB4 cells were treated with 1μM ATO for indicated time points and were assessed by immunofluorescence staining with an anti-PML antibody (green). Stainings were analyzed using a Leica TCS SP5 confocal microscope equipped with a 63×/1.4 NA oil objective (Leica Microsystems). Images were processed using Leica AF lite software. (C) Arsenic induces dual effects on APL cells. The NB4 cells were treated with indicated concentration for 48 hours and stained with the Wright stain. Stainings were analyzed using an Olympus BX51 research microscope equipped with a 100×/1.30 NA oil objective (Olympus). Images were processed using Adobe Photoshop CS (Adobe Systems). Original magnification, ×1000. (D) Colocalization of PML and PML-RARα with the fluorescent organic arsenical ReAsH in NB4 cells. Images were visualized and processed using the equipment described for panel B. (E) The schematic diagram of the structure of PML RING coordinated with zinc or arsenic. (F) Predicted structure of PML RING/UBC9 complex. (G) A working model of the mechanism by which arsenic controls the fate of PML and PML-RARα.

Close modal

Because the wild-type PML and the PML moiety in the fusion protein harbor a number of adjacently located cysteine residues with metal-binding ability in their RBCC domain,71,72  we hypothesized that ATO might target PML/PML-RARα at this domain. We tested this possibility by biotin-arsenic/streptavidin pull-down affinity assay and a red fluorescent organic arsenic compound ReAsH/immunofluorescent analysis. Zhang et al79  and Jeanne et al46  showed that ReAsH colocalized with PML/PML-RARα (Figure 2D) and that arsenic could directly bind the wild-type and fusion proteins. Consistently, deletion of the RING domain in PML abolished the ReAsH colocalization signal. The PML RING peptide containing C3HC4 (aa 57-91) zinc finger (ZF) was expressed and purified for refined arsenic-binding analyses. With the use of matrix-assisted laser desorption ionization– time of flight mass spectrometry, it was found that 1 PML RING molecule without metal ions (apo-PML RING) could bind 2 arsenics at ATO concentrations of 1-2μM.79  Arsenic bound PML RING through thiol groups of cysteines with the formation of arsenic-sulphur bonds, as evidenced by near-ultraviolet absorbance spectrometry assays. With the use of x-ray absorption spectra assay, including extended x-ray absorption fine structure and x-ray absorption near-edge structure, the local structures of PML RING around metal ions within ∼ 6 Å were obtained, and it was found that trivalent arsenics could coordinate to PML RING each by 3 conserved cysteines, in ZF1 with C60, C77, and C80 and in ZF2 with C72, C88, and C91, compared with the coordination by zinc in ZF1 with C57, C60, C77, C80 and in ZF2 with C72, H74, C88, and C91 (Figure 2E). In addition, the PML B box 2 domain also directly bound arsenic in vitro, whereas its deletion led to a significant reduction of ReASH colocalization signals in cells.46,79  Of note, arsenic was able to competitively replace zinc in PML RING coordinated with zinc (zinc-PML RING) according to the nuclear magnetic resonance heteronuclear single-quantum coherence spectra.79  On binding to arsenic, PML RING underwent conformational changes and aggregation, most probably because of the formation of homodimer by intermolecular As-S bonds, followed by oligomerization among these homodimers.46,79  In in vitro reconstituted conditions and mammalian 2-hybrid assay in cells, arsenic binding to PML facilitated its interaction with the unique small ubiquitin-like protein (SUMO) E2 conjugase UBC9, leading to sumoylation at K65 and K160.80  K160 sumoylation also mediated subsequent recruitment of 11S proteasome.78,81  A 3-dimensional structure modeling shows that the 2 ZFs in PML RING motif locate at the interface with UBC9, providing a structural basis for the formation of PML/UBC9 complex in the presence of arsenic (Figure 2F). Recent studies indicate that RNF4, a ubiquitin E3 ligase containing SUMO interaction motifs,77,82  could recruit sumoylated PML/PML-RARα and promote their proteasomal degradation.77,82  These results show that ATO controls the fate of the PML-RARα by directly binding PML (Figure 2G) and, at least partially, explaining why ATO is effective for APL.79 

In addition to formation of arsenic-cysteine bonds that favor aggregation, arsenic-induced ROS also initiate intermolecular disulfide formation.46  Disulfide-linked PML or PML-RARα multimers become nuclear matrix-associated and form NBs. Thus, PML oxidation regulated NB biogenesis. In that respect, non–arsenical oxidants also elicited PML-RARα multimerization, NB association, degradation, and leukemia response in vivo. Critically, oxidants did not affect PLZF-RARα–driven APL, a genetic demonstration that PML is the key target.46  Arsenic can also bind other proteins, including the ubiquitin E3 ligases c-CBL (Casitas B-lineage lymphoma) and SIAH1,83  both harboring RING finger motifs (Table 2).

Table 2

Arsenic binding proteins

Proteins and referencesDisease or cell linesCategoryFunctions
PML79  APL Phosphoprotein; scaffold protein Tumor suppressor; probable transcription factor 
c-CBL83  CML, K562 cells Ubiquitin E3 ligase Proteolysis 
SIAH183  CML, K562 cells Ubiquitin E3 ligase Proteolysis 
Trx R84  MCF-7 cells Oxidoreductase Redox regulation 
GSR85  Arsenic toxication Oxidoreductase Redox regulation 
TPX-2 II86  Ovary cells Peroxidase Redox regulation 
PDI87  Fibrosarcoma cells Oxidoreductase Redox regulation 
MTs88  Arsenic detoxication Metallothioneins Binding heavy metals 
MTF189  Arsenic detoxication Transcription factor Activation of metallothionein transcription 
Keap127  hepa1c1c7 cells Phosphoprotein Transcription regulation 
Tubulins90-92  K562 cells Cell skeleton proteins Structural subunit of microtubules 
β-Actin91-93  K562 and MCF-7 cells Cell skeleton proteins Cytoskeleton 
PPM1D94  Malignancies Phosphatase; oncoprotein Protein serine/threonine phosphatase; regulation of cell cycle 
JNK phosphatase26  Carcinogenesis Dual specificity protein phosphatase Cellular signaling 
Iκ B95  Inflammation and carcinogenesis Protein kinase Regulation of NFκB pathway 
Galectin-186,96  Ovary cells Pyruvate kinase Regulation of NFκB pathway 
PKM291  MCF-7 cells Phosphoprotein Glycolysis 
Hemoglobin97  Red blood cells Globin family Oxygen transport 
Proteins and referencesDisease or cell linesCategoryFunctions
PML79  APL Phosphoprotein; scaffold protein Tumor suppressor; probable transcription factor 
c-CBL83  CML, K562 cells Ubiquitin E3 ligase Proteolysis 
SIAH183  CML, K562 cells Ubiquitin E3 ligase Proteolysis 
Trx R84  MCF-7 cells Oxidoreductase Redox regulation 
GSR85  Arsenic toxication Oxidoreductase Redox regulation 
TPX-2 II86  Ovary cells Peroxidase Redox regulation 
PDI87  Fibrosarcoma cells Oxidoreductase Redox regulation 
MTs88  Arsenic detoxication Metallothioneins Binding heavy metals 
MTF189  Arsenic detoxication Transcription factor Activation of metallothionein transcription 
Keap127  hepa1c1c7 cells Phosphoprotein Transcription regulation 
Tubulins90-92  K562 cells Cell skeleton proteins Structural subunit of microtubules 
β-Actin91-93  K562 and MCF-7 cells Cell skeleton proteins Cytoskeleton 
PPM1D94  Malignancies Phosphatase; oncoprotein Protein serine/threonine phosphatase; regulation of cell cycle 
JNK phosphatase26  Carcinogenesis Dual specificity protein phosphatase Cellular signaling 
Iκ B95  Inflammation and carcinogenesis Protein kinase Regulation of NFκB pathway 
Galectin-186,96  Ovary cells Pyruvate kinase Regulation of NFκB pathway 
PKM291  MCF-7 cells Phosphoprotein Glycolysis 
Hemoglobin97  Red blood cells Globin family Oxygen transport 

Elimination of leukemia-initiating cells.

Leukemia-initiating cells (LICs) are pluripotent, self-renewing, phenotypically primitive and mitotically quiescent cells that have been identified in acute and chronic myeloid and lymphoid leukemia subtypes. Their noncycling status and inherent or acquired drug resistance mechanisms allow them to escape conventional and targeted therapies that effectively kill proliferating leukemia cells.98  In APL, PML-RARα is required, and even a minute amount of the oncoprotein allows LICs self-renewal in vivo.99  Zheng et al100  showed that in Sca1+/lin murine hematopoietic stem cells retrovirally transduced with PML-RARα and LICs from PML-RARα mice, ex vivo treatment with arsenic overcomes the aberrant stem cell capacity of PML-RARα+ LICs. Whereas transcriptional activation of PML-RARα on effect of ATRA probably controls differentiation, only the catabolism of the fusion protein triggers LIC eradication and long-term remission of mouse APL.99  ATRA induces differentiation of PLZF-RARα–driven mouse APL, but neither LIC clearance nor disease remission was achieved, explaining the clinical ATRA resistance of this rare APL subtype. Importantly, the ATRA/ATO combination rapidly clears PML-RARα+ LICs, resulting in APL eradication in murine models and patients.99  Because anthracyclines101  produce ROS, the ATRA and idarubicin regimen102  may induce PML-RARα degradation and hence promote LIC clearance, resulting in dramatically prolonged survival.102 

Arsenic targeting of PML may also be important in the non-APL setting. Indeed, Ito et al103  showed that PML was required for hematopoietic stem cell maintenance, and in CML it appeared to be the factor that enabled LICs to maintain their quiescence—the inert state that prevented them from being destroyed by cancer therapies. Interestingly, ATO could reversibly decrease PML expression in LICs, suggesting that this agent may be of broader interest than previously thought. In gliomas, ATO seemed able to inhibit the Notch pathway and deplete the cancer stem-like cell population.104  ATO was shown to antagonize the Hedgehog pathway by preventing ciliary accumulation and reducing stability of the Gli2 transcriptional effector.105  ATO also represses NFκB106  and β-catenin,107  facilitating elimination of LICs (Figure 3).

Figure 3

Arsenic targets critical pathways for the leukemia-initiating cells. Arsenic induces generation of ROS, perturbation of some signal pathways, and modulation of transcriptional factors. Arsenic also activates MEK1/ERK pathway, whereas combination of MEK1 inhibitor (MEKi, red filled circle) and arsenic results in synergistic antitumor effects.

Figure 3

Arsenic targets critical pathways for the leukemia-initiating cells. Arsenic induces generation of ROS, perturbation of some signal pathways, and modulation of transcriptional factors. Arsenic also activates MEK1/ERK pathway, whereas combination of MEK1 inhibitor (MEKi, red filled circle) and arsenic results in synergistic antitumor effects.

Close modal

Cell differentiation, apoptosis, and autophagy.

At the cellular level, ATO exerts dose-dependent dual effects on APL cells70  in that it induces apoptosis through activating the mitochondria-mediated intrinsic apoptotic pathway at high concentrations (1-2μM) and promotes cell differentiation at low concentrations (0.25-0.5μM; Figure 2C). The mechanisms of proapoptotic activity of ATO were scrutinized by many groups at gene/protein levels,38,108  and a large body of information has been gathered, including histone H3 phosphoacetylation at the CASP-10109 ; the involvement of JNK signaling110 ; anion exchanger 2111  and GSTP1-1112 ; the suppression of human telomerase reverse transcriptase (hTERT), C17, and C-MYC through Sp1 oxidation113 ; the repression of NFκB activation106 ; and the down-regulation of the WT1 gene.114  A pathway composed of ataxia telangiectasia mutated and Rad3-related, PML, CHK2, and p53 has been proposed to mediate ATO-induced apoptosis.115  ATO up-regulates a set of genes such as NADPH oxidase116  and 8-hydroxy-2′-deoxyguanosine (8-OHdG),117  and causes generation of ROS, which play a role as a mediator to induce apoptosis through release of cytochrome c to cytosol and activation of caspases. However, although all those mechanisms probably contribute to chronic or acute arsenic toxicity, it is unclear what is their contribution to arsenic response in APL, because they are unlikely to be specific for APL cells.

Recent studies further showed that in APL cells both ATRA and ATO induce autophagy by the mammalian target of rapamycin (mTOR)118  or MEK/ERK pathway,119  and autophagic degradation contributes significantly to proteolysis of PML-RARα. Inhibitors of autophagy or molecular targeting of BECN1 or ATG7 results in reversal of the suppressive effects of ATO on leukemic cells.119 

Arsenic-based combinatory therapeutic regimens

ATO/ATRA combination.

Rationales.

Combination treatment regimens have been carefully designed to conquer APL.38  In a PML-RARα mouse model and a human NB4 APL cell line–based ascites/leukemia mouse model, ATRA/ATO combination dramatically prolongs survival or even eradicates the disease.120,121  Both ATO99,100  and ATRA99  induce LIC loss in PML-RARα mouse APL and the combination of the two agents results in synergistic clearance of LICs through cooperative PML-RARα degradation. Moreover, ATRA was shown to be able to increase the expression of the cell membrane arsenic transporter AQP9, which facilitated arsenic uptake.122 

Although ATO alone induces partial differentiation,70  it synergizes with cAMP analog 8-CPT-cAMP in inducing full maturation of ATRA-sensitive and ATRA-resistance cells.123,124  However, activation of cAMP signaling was shown to enhance LIC loss by ATRA.99,125,126  Interestingly, ATRA could rapidly trigger a marked increase in the intracellular cAMP level and cAMP-dependent protein kinase (PKA) activity.127  Therefore, a cross talk may exist between ATO and ATRA signaling pathways through the cAMP/PKA node.

Moreover, ATRA potentiates ATO-induced RXRα phosphorylation and cooperates with ATO to induce apoptosis,128  and it was shown that ATRA induced degradation, whereas ATO antagonized catabolism of IκB.106  In the maturation-resistant NB4-R1 cells, ATRA exhibited antiproliferative properties through down-regulation of telomerase,129  and ATO enhanced this effect.130  When transcriptome/proteome approaches were used, Zheng et al131  reported that, although ATRA mainly caused transcriptional remodeling, ATO induced a deeper change of proteome pattern. ATRA/ATO combination amplified RA signaling, as highlighted by molecules involving IFN, calcium, cAMP/PKA, MAPK/JNK/p38, G-CSF, and TNF pathways. ATRA/ATO combination strongly activated the ubiquitin-proteasome pathway and significantly repressed genes/proteins promoting cell cycle or enhancing cell proliferation. Interestingly, the ATRA/ATO combination did not enhance the expression of stress response–related genes, including HSPA8, HSPCA, and AHSAI.131  Taken together, these results suggest that the ATRA/ATO combination may cause a synergy in therapeutic efficacy but not adverse effects.

Clinical efficacy.

A randomized clinical trial comparing ATRA/ATO combination and monotherapy was conducted in SIH from April 2001 to February 2003.38,45,132  Sixty-one APL cases were randomly assigned into 3 groups treated, respectively with ATRA, ATO, and the combination of the 2. It was reported in 2004 that the 3 groups achieved the same results in terms of CR rates (≥ 90%), although the combination therapy group needed the shortest time duration for remission induction. An obvious advantage of the combination therapy was that it generated much less minimal residual disease after consolidation than the 2 other therapeutic approaches as measured with real-time quantitative RT-PCR for PML-RARα. After a follow-up of 8-30 months all patients in the combination therapy group were in good clinical remission, whereas 7 of 37 cases in the 2 monotherapy groups relapsed (P < .05), showing the superiority of the combination therapy.45  Under this circumstance, the investigators from the SIH decided, from the ethical point of view, a termination of the randomized grouping and only the arm of combination therapy should be extended. In 2009, SIH reported the results of 85 patients administrated ATRA/ATO with a median follow-up of 70 months. Eighty patients (94.1%) entered CR.39  Kaplan-Meier estimates of the 5-year EFS and OS for all patients were 89.2% ± 3.4% and 91.7% ± 3.0%, respectively, and the 5-year relapse-free survival and OS for patients who achieved CR (n = 80) were 94.8% ± 2.5% and 97.4% ± 1.8%, respectively. On ATRA/ATO, prognosis was not influenced by initial white blood cell count, distinct PML-RARα types, or FLT3 mutations. The toxicity profile was mild and reversible (see “Adverse effects of arsenic”). The results were confirmed by recent long-term follow-up studies.133,134  Powell et al59  reported that of the 244 patients who received ATRA/chemotherapy as induction and ATRA/chemotherapy plus ATO as consolidation therapies, 195 cases (80%) achieved a 3-year EFS. Compared with the SIH trial that used ATRA/ATO/chemotherapy as induction therapy,39  the slightly lower EFS rate of this study might be because of the multicenter nature of the trial or could reflect the advantage of incorporating ATO into induction remedy for newly diagnosed APL. Taken together, ATRA/ATO/chemotherapy combinatory regimen transforms APL from a highly fatal to a highly curable disease.

Realgar-Indigo Naturalis Formula.

ATRA/As4S4 combination also showed enhanced therapeutic efficacy in APL.62  In traditional Chinese medicine, combination therapy containing multiple drugs with distinct but related mechanisms has been advocated for > 2500 years by prescriptions called formulas to amplify therapeutic efficacies of each agent and to minimize adverse effects.30,135  On the basis of traditional Chinese medicine theories, a patented Realgar-Indigo Naturalis Formula (RIF) was designed in the 1980s,63  in which a mined ore realgar was the principle element, whereas indigo naturalis, Salvia miltiorrhiza, and radix pseudostellariae were adjuvant components to assist the effects of realgar. Multicenter clinical trials showed that a CR rate of 96.7%136  to 98%63  and a 5-year OS rate of 86.88%137  were achieved in patients with APL receiving RIF, with moderate gastrointestinal discomfort and rash as the main adverse effects. Realgar in combination with indigo also exhibited an extent of anti-APL activity.138  The mechanisms of action of RIF were carefully dissected with the use of As4S4 (A), indirubin (I), and tanshinone IIA (T) as representatives of realgar, indigo naturalis, and Salvia miltiorrhiza, respectively,139  and it was shown that ATI combination yielded enhanced therapeutic efficacies against APL in murine model. ATI combination caused synergic effects and resulted in a much more profound differentiation of APL cells, potentiated ubiquitination and degradation of PML-RARα oncoprotein, stronger reprogramming of myeloid differentiation regulators, and enhanced G1/G0 arrest compared with cells treated with monoagents or biagents. Furthermore, T and I up-regulated AQP9 and facilitated transportation of arsenic into malignant promyelocytes, which in turn intensified arsenic-mediated PML-RARα degradation and therapeutic efficacies (Figure 4). These results open a new window for a better understanding of the therapeutic strategies of other traditional formulas.

Figure 4

Mechanisms of action of representative components of RIF in treating APL. As, As4S4; Ind, indirubin; Tan, tanshinone IIA.

Figure 4

Mechanisms of action of representative components of RIF in treating APL. As, As4S4; Ind, indirubin; Tan, tanshinone IIA.

Close modal

ATO in combination with MEK1 inhibition.

Studies have shown that activation of ERK1/2 as well as of the kinases immediately upstream of ERK, known as MAP/ERK kinases or MEKs can confer a drug-resistant phenotype to cancer cells. For example, rapamycin and its analogs activate the MAPK pathway in solid tumor,140  imatinib increases the activity of p42/44 MAPK in CML CD34+ cells that contributes to incomplete elimination of CML progenitors,141  and FLT3 inhibitor-resistant cells show continued activation of PI3K/AKT and/or RAS/MEK/MAPK signaling pathways.142  Accordingly, MAPK/MEK inhibitors may be helpful to overcome drug resistance in leukemic cells. Altman et al143  showed that in leukemia cells on ATO treatment, the AKT kinase is phosphorylated/activated to regulate downstream engagement of mTOR and its effectors. Targeted disruption of AKT1/AKT2 genes or inhibition of mTOR strongly enhances ATO's effects on leukemia cells.143  Treatment with ATO induces a MAPK-mediated PML phosphorylation144  that is associated with subsequent ubiquitination and proteasomal degradation.46  Lunghi et al145  reported that APL cells exploited the RAS-MAPK pathway to inactivate the proapoptotic protein BAD by phosphorylation at Ser112 and to delay ATO-induced apoptosis. MEK1 inhibitors suppressed ERK1/2, dephosphorylated BAD, and inhibited the ATO-induced increase of Bcl-xL, resulting in enhanced apoptosis and overcoming drug resistance.145  Combined use of ATO and MEK1 inhibitors leads to induction of the p53AIP1 (p53-regulated apoptosis-inducing protein 1) in NB4 and K562 cell lines146  and primary cells from patients with AML,137  and inhibition of tumor growth and elongation of survival in a human xenograft multiple myeloma model. These studies provide the framework for testing MEK1 inhibitor/ATO combination in patients with hematologic malignancies.148 

CML, a malignant myeloproliferative disease originated from pluripotential hematopoietic stem cells, is characterized by the Philadelphia chromosome formed by translocation t(9;22)(q34;q11) that generates a chimeric fusion protein BCR-ABL with constitutively activated tyrosine kinase activity.149  Imatinib mesylate (IM; or Gleevec, Glivec, or STI571), a rationally designed BCR-ABL inhibitor, has shown remarkable clinical efficacy that achieved an estimated 5-year OS of 89% in 553 patients with CML.150  However, IM151,152  and dasatinib152,153  do not deplete LICs, whereas a proportion of patients develop IM resistance,152,154-156  and patients with advanced stage disease respond initially but then relapse.152,157  Moreover, cardiotoxicity of IM was also reported.158,159 

Historically, ATO therapy was the first chemotherapeutic intervention for CML. Fowler solution was used to treat CML in the 19th century and became the mainstream therapeutic reagent for leukemia.160  In the 1930s, the efficacy of arsenic in the treatment of CML established it as a primary therapeutic agent for this disease.160  Until the advent of modern chemotherapy, arsenic and radiation were the mainstays of treatment for patients with CML. Arsenic was shown to be able to target PML and to eradicate quiescent LICs in CML.103  ATO inhibited translation of mRNA of BCR/ABL, resulting in attenuation of BCR/ABL levels and apoptosis of human leukemia cells.161  Zhang et al162  reported that arsenic targets BCR-ABL by ubiquitination of key lysine residues, leading to its proteasomal degradation. Recently, Mao et al83  showed that arsenic could directly bind c-CBL, the E3 ligase of BCR-ABL, by the conserved cysteines, including C381 at RING finger domain (Figure 5), resulting in inhibition of c-CBL's self-ubiquitination at K389 and subsequent proteasomal degradation. Consistent with these results, substitution of cysteine at 381 or lysine at 389 by alanine abrogated arsenic binding and c-CBL's self-ubiquitination, respectively. Consequently, elevated c-CBL promoted ubiquitination of BCR-ABL at K1517, leading to degradation of the aberrant kinase (Figure 5).

Figure 5

Effects of arsenic on c-CBL and BCR-ABL in CML cells. (A) Without arsenic treatment, c-CBL is self-ubiquitinated and degraded in proteasome. (B) Arsenic treatment inhibits c-CBL self-ubiquitination and proteasomal degradation, and triggers ubiquitination of BCR-ABL at K1517 followed by degradation in the proteasome.

Figure 5

Effects of arsenic on c-CBL and BCR-ABL in CML cells. (A) Without arsenic treatment, c-CBL is self-ubiquitinated and degraded in proteasome. (B) Arsenic treatment inhibits c-CBL self-ubiquitination and proteasomal degradation, and triggers ubiquitination of BCR-ABL at K1517 followed by degradation in the proteasome.

Close modal

Arsenic exerts synergistic effects with IM in inducing apoptosis of CML cells and in prolonging survival of mice inoculated with CML cells.162-164  It was shown that arsenic and IM induce cell cycle arrest at G2/M and G1 phases, respectively. Arsenic and IM synergistically activate the endogenous and exogenous endoplasmic reticulum (ER) stress, leading to enhanced cell apoptosis.162,163,165  These discoveries provide rationales for a clinical trial to test the arsenic/IM combination therapy in CML.

Arsenic has been used in treating multiple myeloma, myelodysplasia syndrome, and lymphoid malignancies, including non-Hodgkin lymphoma, and has displayed beneficial effects in some cases (Table 3). In adult T-cell leukemia/lymphoma (ATL)–derived cells, ATO reportedly synergized with IFNα to induce cell-cycle arrest and apoptosis176  through down-regulation of the HTLV-1 oncoprotein Tax and inactivation of NF-κB.177,178  Clinically, arsenic/IFN therapy exhibited some efficacy in 7 patients with refractory aggressive ATL,170  whereas in 10 cases of newly diagnosed chronic ATL arsenic/IFN/zidovudine combination showed an impressive 100% response rate.171  Recent animal studies in Lck-Tax transgenics that develop an ATL-like disease have recapitulated the therapeutic action of the arsenic/IFNα association, strongly suggesting that the latter is actually targeting Tax for degradation.179  Moreover, transplantation studies have shown that Tax degradation is accompanied by loss of leukemia-initiating activity, but not short-term growth, providing a striking parallel with APL and suggesting that arsenic may promote catabolism of specific classes of oncoproteins.

Table 3

Clinical studies of arsenic in treating other malignancies

DiseaseYearAuthorsNo.RegimenResponse
MM 2006 Berenson et al166  65 ATO + AA + melphan 2 CR; 15 PR; 14 MR 
 2006 Abou-Jawde et al167  20 ATO + AA + dexamethasone 6 PR 
 2006 Wu et al168  20 ATO + AA + dexamethasone 2 PR; 6 MR 
 2007 Berenson et al169  22 ATO + AA + bortezomib 2 PR; 4 MR 
ATL 2004 Hermine et al170  7 (Relapsed/refractory) ATO + IFN 1 CR; 3 PR 
 2009 Kchour et al171  10 (Newly diagnosed) ATO + IFN + zidovudine 9 CR; 1 PR 
MDS 2006 Schiller et al172  76 ATO 1 CR; 13 HI 
 2006 Vey et al173  115 ATO 1 CR; 1 PR; 22 HI 
 2008 Zheng et al174  21 ATO + RA + thalidomide 1 CR; 1 PR; 3 HI 
Lymphoid malignancies 2009 Chang et al175  16 ATO + AA 1 response 
DiseaseYearAuthorsNo.RegimenResponse
MM 2006 Berenson et al166  65 ATO + AA + melphan 2 CR; 15 PR; 14 MR 
 2006 Abou-Jawde et al167  20 ATO + AA + dexamethasone 6 PR 
 2006 Wu et al168  20 ATO + AA + dexamethasone 2 PR; 6 MR 
 2007 Berenson et al169  22 ATO + AA + bortezomib 2 PR; 4 MR 
ATL 2004 Hermine et al170  7 (Relapsed/refractory) ATO + IFN 1 CR; 3 PR 
 2009 Kchour et al171  10 (Newly diagnosed) ATO + IFN + zidovudine 9 CR; 1 PR 
MDS 2006 Schiller et al172  76 ATO 1 CR; 13 HI 
 2006 Vey et al173  115 ATO 1 CR; 1 PR; 22 HI 
 2008 Zheng et al174  21 ATO + RA + thalidomide 1 CR; 1 PR; 3 HI 
Lymphoid malignancies 2009 Chang et al175  16 ATO + AA 1 response 

MM indicates multiple myeloma; AA, ascorbic acid; CR, complete response; PR, partial response; MR, minor response; ATL, adult T-cell leukemia/lymphoma; MDS, myelodysplasia syndrome; HI, hematologic improvement; and RA, retinoic acid.

There are 111 recently completed or ongoing clinical trials listed on www.clinicaltrials.gov that evaluate ATO alone or in combination with other agents for treatment of cancers, excluding APL. ATO is under investigation as treatment for a variety of solid tumors, including lung cancer, hepatocellular carcinoma, and colorectal cancer. Limited clinical activity as a single agent has been reported in a small number of patients with hepatocellular carcinoma, melanoma, and renal cell carcinoma; ATO in combination with chemotherapy has shown promising activity in osteosarcoma and Ewing sarcoma180  (and references in this review article).

Although arsenic seems to be synonymous with poison, nearly all recent clinical trial results suggest that arsenic at therapeutic concentrations is generally well tolerated. No bone marrow depression and chemotherapy-associated secondary malignancy were observed with arsenic treatment.52,54 

Sudden death was recorded in one study,181  and severe liver impairment was documented.53  These toxicities might be because of a genetic basis with exceptional susceptibilities to arsenic toxicity in rare patients, exposure to anthracyclines or other cardiotoxic agents before ATO therapy, and abnormal electrolyte levels, or other unidentified factors.53,57,181,182  Hyperleukocytosis, a retinoic acid syndrome (or differentiation syndrome)–like clinical entity was also reported and was shown to be driven by chemokine production induced by ATO or ATRA as a single agent or in combination.183  In long-term studies,39,57,58,182  the toxicity profile of arsenic was mild, and 24 months after the last dose of ATRA/ATO patients had urine arsenic concentrations well below the safety limit. Mathews et al57  reported that despite counseling against pregnancy after therapy, in view of the absence of data on effect of prior ATO therapy and teratogenicity, 7 patients (4 women and 3 men) have had 8 normal babies.

As a traditional poison, inappropriate use of arsenic may kill people; as one of the oldest drugs in the world, its appropriate application cures some cancer types and saves lives. These facts clearly suggest that when considering how to control an emerging “bad factor,” one might try to find out its other side and the safe translation.

Arsenic is the most potent single agent against APL. The revival of arsenic by its application in treating APL is a unique story in cancer research. It also highlights some of the essential concepts in pharmacology, such as the key importance of the therapeutic ratio between normal cells and the target. It illustrates the power of combinations. Indeed, in APL, ATO/ATRA combination has exhibited drastically enhanced therapeutic efficacy compared with either single agent, transforming the fate of an otherwise highly fatal disease. In treating other types of malignancies, including solid tumors, rational combinatory regimens could be designed to improve clinical outcome. For example, because arsenic binds and activates c-CBL that controls signaling of EGFR, the therapeutic efficacy of ATO in combination with EGFR inhibitor could be tested in non–small cell lung cancer and other related human malignancies.

We apologize to our many colleagues whose work could not be cited because of space restrictions. We thank Prof Zhen-Yi Wang at SIH for his long term support, Dr Laurent Degos from Hospital Saint Louis in Paris, and Dr Samuel Waxman from Mount Sinai Medical Center in New York for friendly long-term collaboration.

This work was supported in part by the Chinese National Key Program for Basic Research (973; 2010CB529200) and National High Tech Program (863), National Natural Science Foundation of China, Shanghai Municipal Commission for Science and Technology, Shanghai Municipal Commission for Education, and Samuel Waxman Cancer Research Foundation.

Contribution: S.-J.C., G.-B.Z., X.-W.Z., J.-H.M., H.d.T., and Z.C. all contributed to the writing of this manuscript.

Conflict-of-interest disclosure: The authors declare no competing financial interests.

Correspondence: Sai-Juan Chen, Shanghai Institute of Hematology, Rui Jin Hospital Affiliated to Shanghai Jiao Tong University School of Medicine, 197 Rui Jin Rd II, Shanghai, 200025, China; e-mail: sjchen@stn.sh.cn; or Zhu Chen, Shanghai Institute of Hematology, Rui Jin Hospital Affiliated to Shanghai Jiao Tong University School of Medicine, 197 Rui Jin Rd II, Shanghai, 200025, China; e-mail: zchen@stn.sh.cn.

1
National Research Council (NRC)
,
Arsenic
,
1977
Washington, DC
The National Academies Press
2
Wolfe-Simon
F
Blum
JS
Kulp
TR
et al.
,
A bacterium that can grow by using arsenic instead of phosphorus [published online ahead of print December 2, 2010].
,
Science
3
Hillestad
LK
,
Acute promyelocytic leukemia.
,
Acta Med Scand
,
1957
, vol.
159
3
(pg.
189
-
194
)
4
Kumagai
Y
Sumi
D
,
Arsenic: signal transduction, transcription factor, and biotransformation involved in cellular response and toxicity.
,
Annu Rev Pharmacol Toxicol
,
2007
, vol.
47
1
(pg.
243
-
262
)
5
ISSI Consulting Group
,
Arsenic Occurrence in Public Drinking Water Supplies
,
2000
Washington, DC
U.S. Environmental Protection Agency
EPA publication no. 815-R-00-023
6
Zhu
J
Chen
Z
Lallemand-Breitenbach
V
de The
H
,
How acute promyelocytic leukaemia revived arsenic.
,
Nat Rev Cancer
,
2002
, vol.
2
9
(pg.
705
-
713
)
7
Sharma
VK
Sohn
M
,
Aquatic arsenic: toxicity, speciation, transformations, and remediation.
,
Environ Int
,
2009
, vol.
35
4
(pg.
743
-
759
)
8
Wang
JP
Qi
L
Moore
MR
Ng
JC
,
A review of animal models for the study of arsenic carcinogenesis.
,
Toxicol Lett
,
2002
, vol.
133
1
(pg.
17
-
31
)
9
Ng
JC
,
Environmental contamination of arsenic and its toxicological impact on humans.
,
Environ Chem
,
2005
, vol.
2
3
(pg.
146
-
160
)
10
Mann
KK
Wallner
B
Lossos
IS
Miller
WH
,
Darinaparsin: a novel organic arsenical with promising anticancer activity.
,
Expert Opin Investig Drugs
,
2009
, vol.
18
11
(pg.
1727
-
1734
)
11
Lin
S
Shi
Q
Nix
FB
et al.
,
A novel S-adenosyl-L-methionine:arsenic(III) methyltransferase from rat liver cytosol.
,
J Biol Chem
,
2002
, vol.
277
13
(pg.
10795
-
10803
)
12
Wood
TC
Salavagionne
OE
Mukherjee
B
et al.
,
Human arsenic methyltransferase (AS3MT) pharmacogenetics: gene resequencing and functional genomics studies.
,
J Biol Chem
,
2006
, vol.
281
11
(pg.
7364
-
7373
)
13
Del Razo
LM
Styblo
M
Cullen
WR
Thomas
DJ
,
Determination of trivalent methylated arsenicals in biological matrices.
,
Toxicol Appl Pharmacol
,
2001
, vol.
174
3
(pg.
282
-
293
)
14
Kitchin
KT
,
Recent advances in arsenic carcinogenesis: modes of action, animal model systems, and methylated arsenic metabolites.
,
Toxicol Appl Pharmacol
,
2001
, vol.
172
3
(pg.
249
-
261
)
15
Chen
GQ
Zhou
L
Styblo
M
et al.
,
Methylated metabolites of arsenic trioxide are more potent than arsenic trioxide as apoptotic but not differentiation inducers in leukemia and lymphoma cells.
,
Cancer Res
,
2003
, vol.
63
8
(pg.
1853
-
1859
)
16
Styblo
M
Del Razo
LM
Vega
L
et al.
,
Comparative toxicity of trivalent and pentavalent inorganic and methylated arsenicals in rat and human cells.
,
Arch Toxicol
,
2000
, vol.
74
6
(pg.
289
-
299
)
17
Smith
AH
Hopenhayn-Rich
C
Bates
MN
et al.
,
Cancer risks from arsenic in drinking water.
,
Environ Health Perspect
,
1992
, vol.
97
(pg.
259
-
267
)
18
Hughes
MF
,
Arsenic toxicity and potential mechanisms of action.
,
Toxicol Lett
,
2002
, vol.
133
1
(pg.
1
-
16
)
19
Vallee
BL
Ulmer
DD
Wacker
WE
,
Arsenic toxicology and biochemistry.
,
A M A Arch Ind Health
,
1960
, vol.
21
(pg.
132
-
151
)
20
The World Bank
,
Environment and Social Unit-South Asia Region. Towards a More Effective Operational Response. Arsenic Contamination of Groundwater in South and East Asian Countries
,
2005
Washington, DC
The World Bank
Vol II technical report
21
Aposhian
HV
Aposhian
MM
,
Arsenic toxicology: five questions.
,
Chem Res Toxicol
,
2006
, vol.
19
1
(pg.
1
-
15
)
22
Teixeira
MC
Ciminelli
VST
Dantas
MSS
Diniz
SF
Duarte
HA
,
Raman spectroscopy and DFT calculations of As(III) complexation with a cysteine-rich biomaterial.
,
J Colloid Interface Sci
,
2007
, vol.
315
1
(pg.
128
-
134
)
23
Schuliga
M
Chouchane
S
Snow
ET
,
Upregulation of glutathione-related genes and enzyme activities in cultured human cells by sublethal concentrations of inorganic arsenic.
,
Toxicol Sci
,
2002
, vol.
70
2
(pg.
183
-
192
)
24
Zhou
X
Sun
H
Ellen
TP
Chen
H
Costa
M
,
Arsenite alters global histone H3 methylation.
,
Carcinogenesis
,
2008
, vol.
29
9
(pg.
1831
-
1836
)
25
Andrew
AS
Mason
RA
Memoli
V
Duell
EJ
,
Arsenic activates EGFR pathway signaling in the lung.
,
Toxicol Sci
,
2009
, vol.
109
2
(pg.
350
-
357
)
26
Cavigelli
M
Li
WW
Lin
A
et al.
,
The tumor promoter arsenite stimulates AP-1 activity by inhibiting a JNK phosphatase.
,
EMBO J
,
1996
, vol.
15
22
(pg.
6269
-
6279
)
27
He
X
Ma
Q
,
Critical cysteine residues of Kelch-like ECH-associated protein 1 in arsenic sensing and suppression of nuclear factor erythroid 2-related factor 2.
,
J Pharmacol Exp Ther
,
2010
, vol.
332
1
(pg.
66
-
75
)
28
Pi
J
Qu
W
Reece
JM
Kumagai
Y
Waalkes
MP
,
Transcription factor Nrf2 activation by inorganic arsenic in cultured keratinocytes: involvement of hydrogen peroxide.
,
Exp Cell Res
,
2003
, vol.
290
2
(pg.
234
-
245
)
29
Hughes
MF
,
Biomarkers of exposure: a case study with inorganic arsenic.
,
Environ Health Perspect
,
2006
, vol.
114
11
(pg.
1790
-
1796
)
30
,
The Inner Canon of Emperor Huang (Originally published in the Spring and Autumn and the Warring States Periods of China, 722 BC-221 BC).
,
2003
Beijing, China
Chinese Medical Ancient Books Publishing House
31
Huang
B
Wang
Y
,
Thousand Formulas and Thousand Herbs of Traditional Chinese Medicine
,
1993
Harbin, China
Heilongjiang Education Press
32
Li
SZ
,
The Compendium of Materia Medica (Originally published in the Ming Dynasty of China, 1578)
,
1982
Beijing, China
People's Medical Publishing House
33
Jolliffe
DM
,
A history of the use of arsenicals in man.
,
J R Soc Med
,
1993
, vol.
86
5
(pg.
287
-
289
)
34
Sears
DA
,
History of the treatment of chronic myelocytic leukemia.
,
Am J Med Sci
,
1988
, vol.
296
2
(pg.
85
-
86
)
35
Zhou
G
Zhang
J
Wang
Z
Chen
S
Chen
Z
,
Treatment of acute promyelocytic leukaemia with all-trans retinoic acid and arsenic trioxide: a paradigm of synergistic molecular targeting therapy.
,
Phil Trans R Soc B
,
2007
, vol.
362
1482
(pg.
959
-
971
)
36
Degos
L
,
The history of acute promyelocytic leukaemia.
,
Br J Haematol
,
2003
, vol.
122
4
(pg.
539
-
553
)
37
Zhou
GB
Zhao
WL
Wang
ZY
Chen
SJ
Chen
Z
,
Retinoic acid and arsenic for treating acute promyelocytic leukemia.
,
PLoS Med
,
2005
, vol.
2
1
(pg.
33
-
38
)
38
Wang
ZY
Chen
Z
,
Acute promyelocytic leukemia: from highly fatal to highly curable.
,
Blood
,
2008
, vol.
111
5
(pg.
2505
-
2515
)
39
Hu
J
Liu
YF
Wu
CF
et al.
,
Long-term efficacy and safety of all-trans retinoic acid/arsenic trioxide-based therapy in newly diagnosed acute promyelocytic leukemia.
,
Proc Natl Acad Sci U S A
,
2009
, vol.
106
9
(pg.
3342
-
3347
)
40
Bernard
J
Weil
M
Boiron
M
et al.
,
Acute promyelocytic leukemia: results of treatment by daunorubicin.
,
Blood
,
1973
, vol.
41
4
(pg.
489
-
496
)
41
Huang
ME
Ye
YC
Chen
SR
et al.
,
Use of all-trans retinoic acid in the treatment of acute promyelocytic leukemia.
,
Blood
,
1988
, vol.
72
2
(pg.
567
-
572
)
42
Ades
L
Guerci
A
Raffoux
E
et al.
,
Very long-term outcome of acute promyelocytic leukemia after treatment with all-trans retinoic acid and chemotherapy: the European APL Group experience.
,
Blood
,
2010
, vol.
115
9
(pg.
1690
-
1696
)
43
Creutzig
U
Zimmermann
M
Dworzak
M
et al.
,
Favourable outcome of patients with childhood acute promyelocytic leukaemia after treatment with reduced cumulative anthracycline doses.
,
Br J Haematol
,
2010
, vol.
149
3
(pg.
399
-
409
)
44
Wang
ZY
,
Ham-Wasserman lecture: treatment of acute leukemia by inducing differentiation and apoptosis.
,
Hematology Am Soc Hematol Educ Program
,
2003
(pg.
1
-
13
)
45
Shen
ZX
Shi
ZZ
Fang
J
et al.
,
All-trans retinoic acid/As2O3 combination yields a high quality remission and survival in newly diagnosed acute promyelocytic leukemia.
,
Proc Natl Acad Sci U S A
,
2004
, vol.
101
15
(pg.
5328
-
5335
)
46
Jeanne
M
Lallemand-Breitenbach
V
Ferhi
O
et al.
,
PML/RARA oxidation and arsenic binding initiate the antileukemia response of As2O3.
,
Cancer Cell
,
2010
, vol.
18
1
(pg.
88
-
98
)
47
Rego
EM
He
LZ
Warrell
RP
Wang
ZG
Pandolfi
PP
,
Retinoic acid (RA) and As2O3 treatment in transgenic models of acute promyelocytic leukemia (APL) unravel the distinct nature of the leukemogenic process induced by the PML-RARalpha and PLZF-RARalpha oncoproteins.
,
Proc Natl Acad Sci U S A
,
2000
, vol.
97
18
(pg.
10173
-
10178
)
48
Koken
MH
Daniel
MT
Gianni
M
et al.
,
Retinoic acid, but not arsenic trioxide, degrades the PLZF/RARalpha fusion protein, without inducing terminal differentiation or apoptosis, in a RA-therapy resistant t(11;17)(q23;q21) APL patient.
,
Oncogene
,
1999
, vol.
18
4
(pg.
1113
-
1118
)
49
Licht
JD
Chomienne
C
Goy
A
et al.
,
Clinical and molecular characterization of a rare syndrome of acute promyelocytic leukemia associated with translocation (11;17).
,
Blood
,
1995
, vol.
85
4
(pg.
1083
-
1094
)
50
Chen
Z
Brand
NJ
Chen
A
et al.
,
Fusion between a novel Kruppel-like zinc finger gene and the retinoic acid receptor-alpha locus due to a variant t(11;17) translocation associated with acute promyelocytic leukaemia.
,
EMBO J
,
1993
, vol.
12
3
(pg.
1161
-
1167
)
51
de The
H
Chen
Z
,
Acute promyelocytic leukaemia: novel insights into the mechanisms of cure.
,
Nat Rev Cancer
,
2010
, vol.
10
11
(pg.
775
-
783
)
52
Sun
HD
Ma
L
Hu
XC
Zhang
TD
,
Ai-Lin I treated 32 cases of acute promyelocytic leukemia.
,
Chin J Integrat Chin West Med
,
1992
, vol.
12
(pg.
170
-
171
)
53
Niu
C
Yan
H
Yu
T
et al.
,
Studies on treatment of acute promyelocytic leukemia with arsenic trioxide: remission induction, follow-up, and molecular monitoring in 11 newly diagnosed and 47 relapsed acute promyelocytic leukemia patients.
,
Blood
,
1999
, vol.
94
10
(pg.
3315
-
3324
)
54
Shen
ZX
Chen
GQ
Ni
JH
et al.
,
Use of arsenic trioxide (As2O3) in the treatment of acute promyelocytic leukemia (APL), II: clinical efficacy and pharmacokinetics in relapsed patients.
,
Blood
,
1997
, vol.
89
9
(pg.
3354
-
3360
)
55
Shigeno
K
Naito
K
Sahara
N
et al.
,
Arsenic trioxide therapy in relapsed or refractory Japanese patients with acute promyelocytic leukemia: updated outcomes of the phase II study and postremission therapies.
,
Int J Hematol
,
2005
, vol.
82
3
(pg.
224
-
229
)
56
Soignet
SL
Frankel
SR
Douer
D
et al.
,
United States multicenter study of arsenic trioxide in relapsed acute promyelocytic leukemia.
,
J Clin Oncol
,
2001
, vol.
19
18
(pg.
3852
-
3860
)
57
Mathews
V
George
B
Chendamarai
E
et al.
,
Single-agent arsenic trioxide in the treatment of newly diagnosed acute promyelocytic leukemia: long-term follow-up data.
,
J Clin Oncol
,
2010
, vol.
28
24
(pg.
3866
-
3871
)
58
Zhou
J
Zhang
Y
Li
J
et al.
,
Single-agent arsenic trioxide in the treatment of children with newly diagnosed acute promyelocytic leukemia.
,
Blood
,
2010
, vol.
115
9
(pg.
1697
-
1702
)
59
Powell
BL
Moser
B
Stock
W
et al.
,
Arsenic trioxide improves event-free and over-all survival for adults with acute promyelocytic leukemia: North American Leukemia Intergroup Study C9710.
,
Blood
,
2010
, vol.
116
19
(pg.
3751
-
3757
)
60
Dai
CW
Zhang
GS
Shen
JK
et al.
,
Use of all-trans retinoic acid in combination with arsenic trioxide for remission induction in patients with newly diagnosed acute promyelocytic leukemia and for consolidation/maintenance in CR patients.
,
Acta Haematol
,
2009
, vol.
121
1
(pg.
1
-
8
)
61
Ghavamzadeh
A
Alimoghaddam
K
Ghaffari
SH
et al.
,
Treatment of acute promyelocytic leukemia with arsenic trioxide without ATRA and/or chemotherapy.
,
Ann Oncol
,
2006
, vol.
17
1
(pg.
131
-
134
)
62
Wu
T
Zhao
J
Jiang
B
et al.
,
Tetra-arsenic tetra-sulfide containing triple-agent regimen as the first line therapy for acute promyelocytic leukemia: expeditiously consecutive complete remission and improved disease-free survival [abstract].
,
Blood
,
2007
, vol.
110
11
Abstract 591
63
Huang
SL
Guo
AX
Xiang
Y
et al.
,
Clinical study on the treatment of acute promyelocytic leukemia with Composite Indigo Naturalis tablets.
,
Chin J Hematol
,
1995
, vol.
16
(pg.
26
-
28
)
64
Lu
DP
Qiu
JY
Jiang
B
et al.
,
Tetra-arsenic tetra-sulfide for the treatment of acute promyelocytic leukemia: a pilot report.
,
Blood
,
2002
, vol.
99
9
(pg.
3136
-
3143
)
65
Wang
K
Wang
P
Shi
J
et al.
,
PML/RARalpha targets promoter regions containing PU.1 consensus and RARE half sites in acute promyelocytic leukemia.
,
Cancer Cell
,
2010
, vol.
17
2
(pg.
186
-
197
)
66
Melnick
A
Licht
JD
,
Deconstructing a disease: RARalpha, its fusion partners, and their roles in the pathogenesis of acute promyelocytic leukemia.
,
Blood
,
1999
, vol.
93
10
(pg.
3167
-
3215
)
67
Kamashev
D
Vitoux
D
de The
H
,
PML-RARA-RXR oligomers mediate retinoid and rexinoid/cAMP cross-talk in acute promyelocytic leukemia cell differentiation.
,
J Exp Med
,
2004
, vol.
199
8
(pg.
1163
-
1174
)
68
Zhu
J
Koken
MH
Quignon
F
et al.
,
Arsenic-induced PML targeting onto nuclear bodies: implications for the treatment of acute promyelocytic leukemia.
,
Proc Natl Acad Sci U S A
,
1997
, vol.
94
8
(pg.
3978
-
3983
)
69
Chen
GQ
Zhu
J
Shi
XG
et al.
,
In vitro studies on cellular and molecular mechanisms of arsenic trioxide (As2O3) in the treatment of acute promyelocytic leukemia: As2O3 induces NB4 cell apoptosis with downregulation of Bcl-2 expression and modulation of PML-RAR alpha/PML proteins.
,
Blood
,
1996
, vol.
88
3
(pg.
1052
-
1061
)
70
Chen
GQ
Shi
XG
Tang
W
et al.
,
Use of arsenic trioxide (As2O3) in the treatment of acute promyelocytic leukemia (APL), I: As2O3 exerts dose-dependent dual effects on APL cells.
,
Blood
,
1997
, vol.
89
9
(pg.
3345
-
3353
)
71
Borden
KL
Boddy
MN
Lally
J
et al.
,
The solution structure of the RING finger domain from the acute promyelocytic leukaemia proto-oncoprotein PML.
,
EMBO J
,
1995
, vol.
14
7
(pg.
1532
-
1541
)
72
Borden
KL
Lally
JM
Martin
SR
et al.
,
In vivo and in vitro characterization of the B1 and B2 zinc-binding domains from the acute promyelocytic leukemia protooncoprotein PML.
,
Proc Natl Acad Sci U S A
,
1996
, vol.
93
4
(pg.
1601
-
1606
)
73
Butler
JT
Hall
LL
Smith
KP
Lawrence
JB
,
Changing nuclear landscape and unique PML structures during early epigenetic transitions of human embryonic stem cells.
,
J Cell Biochem
,
2009
, vol.
107
4
(pg.
609
-
621
)
74
Lallemand-Breitenbach
V
de The
H
,
PML nuclear bodies.
,
Cold Spring Harb Perspect Biol
,
2010
, vol.
2
5
pg.
a000661
75
Luciani
JJ
Depetris
D
Usson
Y
et al.
,
PML nuclear bodies are highly organised DNA-protein structures with a function in heterochromatin remodelling at the G2 phase.
,
J Cell Sci
,
2006
, vol.
119
Pt 12
(pg.
2518
-
2531
)
76
Daniel
MT
Koken
M
Romagne
O
et al.
,
PML protein expression in hematopoietic and acute promyelocytic leukemia cells.
,
Blood
,
1993
, vol.
82
6
(pg.
1858
-
1867
)
77
Lallemand-Breitenbach
V
Jeanne
M
Benhenda
S
et al.
,
Arsenic degrades PML or PML-RARalpha through a SUMO-triggered RNF4/ubiquitin-mediated pathway.
,
Nat Cell Biol
,
2008
, vol.
10
5
(pg.
547
-
555
)
78
Lallemand-Breitenbach
V
Zhu
J
Puvion
F
et al.
,
Role of promyelocytic leukemia (PML) sumolation in nuclear body formation, 11S proteasome recruitment, and As2O3-induced PML or PML/retinoic acid receptor alpha degradation.
,
J Exp Med
,
2001
, vol.
193
12
(pg.
1361
-
1371
)
79
Zhang
XW
Yan
XJ
Zhou
ZR
et al.
,
Arsenic trioxide controls the fate of the PML-RAR{alpha} oncoprotein by directly binding PML.
,
Science
,
2010
, vol.
328
5975
(pg.
240
-
243
)
80
Zhu
J
Zhou
J
Peres
L
et al.
,
A sumoylation site in PML/RARA is essential for leukemic transformation.
,
Cancer Cell
,
2005
, vol.
7
2
(pg.
143
-
153
)
81
Chen
Z
Zhao
WL
Shen
ZX
et al.
,
Arsenic trioxide and acute promyelocytic leukemia: clinical and biological.
,
Curr Top Microbiol Immunol
,
2007
, vol.
313
(pg.
129
-
144
)
82
Tatham
MH
Geoffroy
MC
Shen
L
et al.
,
RNF4 is a poly-SUMO-specific E3 ubiquitin ligase required for arsenic-induced PML degradation.
,
Nat Cell Biol
,
2008
, vol.
10
5
(pg.
538
-
546
)
83
Mao
JH
Sun
XY
Liu
JX
et al.
,
As4S4 targets RING-type E3 ligase c-CBL to induce degradation of BCR-ABL in chronic myelogenous leukemia.
,
Proc Natl Acad Sci U S A
,
2010
, vol.
107
50
(pg.
21683
-
21688
)
84
Lu
J
Chew
EH
Holmgren
A
,
Targeting thioredoxin reductase is a basis for cancer therapy by arsenic trioxide.
,
Proc Natl Acad Sci U S A
,
2007
, vol.
104
30
(pg.
12288
-
12293
)
85
Rodriguez
VM
Del Razo
LM
Limon-Pacheco
JH
et al.
,
Glutathione reductase inhibition and methylated arsenic distribution in Cd1 mice brain and liver.
,
Toxicol Sci
,
2005
, vol.
84
1
(pg.
157
-
166
)
86
Chang
KN
Lee
TC
Tam
MF
et al.
,
Identification of galectin I and thioredoxin peroxidase II as two arsenic-binding proteins in Chinese hamster ovary cells.
,
Biochem J
,
2003
, vol.
371
Pt 2
(pg.
495
-
503
)
87
Donoghue
N
Yam
PT
Jiang
XM
Hogg
PJ
,
Presence of closely spaced protein thiols on the surface of mammalian cells.
,
Protein Sci
,
2000
, vol.
9
12
(pg.
2436
-
2445
)
88
Ngu
TT
Stillman
MJ
,
Arsenic binding to human metallothionein.
,
J Am Chem Soc
,
2006
, vol.
128
38
(pg.
12473
-
12483
)
89
He
X
Ma
Q
,
Induction of metallothionein I by arsenic via metal-activated transcription factor 1: critical role of C-terminal cysteine residues in arsenic sensing.
,
J Biol Chem
,
2009
, vol.
284
19
(pg.
12609
-
12621
)
90
Li
YM
Broome
JD
,
Arsenic targets tubulins to induce apoptosis in myeloid leukemia cells.
,
Cancer Res
,
1999
, vol.
59
4
(pg.
776
-
780
)
91
Zhang
X
Yang
F
Shim
JY
et al.
,
Identification of arsenic-binding proteins in human breast cancer cells.
,
Cancer Lett
,
2007
, vol.
255
1
(pg.
95
-
106
)
92
Menzel
DB
Hamadeh
HK
Lee
E
et al.
,
Arsenic binding proteins from human lymphoblastoid cells.
,
Toxicol Lett
,
1999
, vol.
105
2
(pg.
89
-
101
)
93
Izdebska
M
Grzanka
A
Ostrowski
M
Zuryn
A
Grzanka
D
,
Effect of arsenic trioxide (Trisenox) on actin organization in K-562 erythroleukemia cells.
,
Folia Histochem Cytobiol
,
2009
, vol.
47
3
(pg.
453
-
459
)
94
Yoda
A
Toyoshima
K
Watanabe
Y
et al.
,
Arsenic trioxide augments Chk2/p53-mediated apoptosis by inhibiting oncogenic Wip1 phosphatase.
,
J Biol Chem
,
2008
, vol.
283
27
(pg.
18969
-
18979
)
95
Kapahi
P
Takahashi
T
Natoli
G
et al.
,
Inhibition of NF-kappa B activation by arsenite through reaction with a critical cysteine in the activation loop of Ikappa B kinase.
,
J Biol Chem
,
2000
, vol.
275
46
(pg.
36062
-
36066
)
96
Lin
CH
Huang
CF
Chen
WY
et al.
,
Characterization of the interaction of galectin-1 with sodium arsenite.
,
Chem Res Toxicol
,
2006
, vol.
19
3
(pg.
469
-
474
)
97
Lu
M
Wang
H
Li
XF
et al.
,
Binding of dimethylarsinous acid to cys-13alpha of rat hemoglobin is responsible for the retention of arsenic in rat blood.
,
Chem Res Toxicol
,
2007
, vol.
20
1
(pg.
27
-
37
)
98
Huntly
BJ
Gilliland
DG
,
Leukaemia stem cells and the evolution of cancer-stem-cell research.
,
Nat Rev Cancer
,
2005
, vol.
5
4
(pg.
311
-
321
)
99
Nasr
R
Guillemin
MC
Ferhi
O
et al.
,
Eradication of acute promyelocytic leukemia-initiating cells through PML-RARA degradation.
,
Nat Med
,
2008
, vol.
14
12
(pg.
1333
-
1342
)
100
Zheng
X
Seshire
A
Ruster
B
et al.
,
Arsenic but not all-trans retinoic acid overcomes the aberrant stem cell capacity of PML/RAR{alpha}-positive leukemic stem cells.
,
Haematologica
,
2007
, vol.
92
3
(pg.
323
-
331
)
101
Berthiaume
JM
Wallace
KB
,
Adriamycin-induced oxidative mitochondrial cardiotoxicity.
,
Cell Biol Toxicol
,
2007
, vol.
23
1
(pg.
15
-
25
)
102
Lo-Coco
F
Avvisati
G
Vignetti
M
et al.
,
Front-line treatment of acute promyelocytic leukemia with AIDA induction followed by risk-adapted consolidation for adults younger than 61 years: results of the AIDA-2000 trial of the GIMEMA Group.
,
Blood
,
2010
, vol.
116
17
(pg.
3171
-
3179
)
103
Ito
K
Bernardi
R
Morotti
A
et al.
,
PML targeting eradicates quiescent leukaemia-initiating cells.
,
Nature
,
2008
, vol.
453
7198
(pg.
1072
-
1078
)
104
Zhen
Y
Zhao
S
Li
Q
Li
Y
Kawamoto
K
,
Arsenic trioxide-mediated Notch pathway inhibition depletes the cancer stem-like cell population in gliomas.
,
Cancer Lett
,
2010
, vol.
292
1
(pg.
64
-
72
)
105
Kim
J
Lee
JJ
Kim
J
Gardner
D
Beachy
PA
,
Arsenic antagonizes the Hedgehog pathway by preventing ciliary accumulation and reducing stability of the Gli2 transcriptional effector.
,
Proc Natl Acad Sci U S A
,
2010
, vol.
107
30
(pg.
13432
-
13437
)
106
Mathieu
J
Besancon
F
,
Arsenic trioxide represses NF-kappaB activation and increases apoptosis in ATRA-treated APL cells.
,
Ann N Y Acad Sci
,
2006
, vol.
1090
(pg.
203
-
208
)
107
Yu
J
Qian
H
Li
Y
et al.
,
Arsenic trioxide (As2O3) reduces the invasive and metastatic properties of cervical cancer cells in vitro and in vivo.
,
Gynecol Oncol
,
2007
, vol.
106
2
(pg.
400
-
406
)
108
Miller
WH
Schipper
HM
Lee
JS
Singer
J
Waxman
S
,
Mechanisms of action of arsenic trioxide.
,
Cancer Res
,
2002
, vol.
62
14
(pg.
3893
-
3903
)
109
Li
J
Chen
P
Sinogeeva
N
et al.
,
Arsenic trioxide promotes histone H3 phosphoacetylation at the chromatin of CASPASE-10 in acute promyelocytic leukemia cells.
,
J Biol Chem
,
2002
, vol.
277
51
(pg.
49504
-
49510
)
110
Davison
K
Mann
KK
Miller
WH
,
Arsenic trioxide: mechanisms of action.
,
Semin Hematol
,
2002
, vol.
39
2 suppl 1
(pg.
3
-
7
)
111
Pan
XY
Chen
GQ
Cai
L
Buscemi
S
Fu
GH
,
Anion exchanger 2 mediates the action of arsenic trioxide.
,
Br J Haematol
,
2006
, vol.
134
5
(pg.
491
-
499
)
112
Bernardini
S
Nuccetelli
M
Noguera
NI
et al.
,
Role of GSTP1-1 in mediating the effect of As2O3 in the acute promyelocytic leukemia cell line NB4.
,
Ann Hematol
,
2006
, vol.
85
10
(pg.
681
-
687
)
113
Chou
WC
Chen
HY
Yu
SL
et al.
,
Arsenic suppresses gene expression in promyelocytic leukemia cells partly through Sp1 oxidation.
,
Blood
,
2005
, vol.
106
1
(pg.
304
-
310
)
114
Glienke
W
Chow
KU
Bauer
N
Bergmann
L
,
Down-regulation of wt1 expression in leukemia cell lines as part of apoptotic effect in arsenic treatment using two compounds.
,
Leuk Lymphoma
,
2006
, vol.
47
8
(pg.
1629
-
1638
)
115
Joe
Y
Jeong
JH
Yang
S
et al.
,
ATR, PML, and CHK2 play a role in arsenic trioxide-induced apoptosis.
,
J Biol Chem
,
2006
, vol.
281
39
(pg.
28764
-
28771
)
116
Chen
YC
Lin-Shiau
SY
Lin
JK
,
Involvement of reactive oxygen species and caspase 3 activation in arsenite-induced apoptosis.
,
J Cell Physiol
,
1998
, vol.
177
2
(pg.
324
-
333
)
117
Ninomiya
M
Kajiguchi
T
Yamamoto
K
et al.
,
Increased oxidative DNA products in patients with acute promyelocytic leukemia during arsenic therapy.
,
Haematologica
,
2006
, vol.
91
11
(pg.
1571
-
1572
)
118
Isakson
P
Bjoras
M
Boe
SO
Simonsen
A
,
Autophagy contributes to therapy-induced degradation of the PML/RARA oncoprotein.
,
Blood
,
2010
, vol.
116
13
(pg.
2324
-
2331
)
119
Goussetis
DJ
Altman
JK
Glaser
H
et al.
,
Autophagy is a critical mechanism for the induction of the antileukemic effects of arsenic trioxide.
,
J Biol Chem
,
2010
, vol.
285
39
(pg.
29989
-
29997
)
120
Jing
Y
Wang
L
Xia
L
et al.
,
Combined effect of all-trans retinoic acid and arsenic trioxide in acute promyelocytic leukemia cells in vitro and in vivo.
,
Blood
,
2001
, vol.
97
1
(pg.
264
-
269
)
121
Lallemand-Breitenbach
V
Guillemin
MC
Janin
A
et al.
,
Retinoic acid and arsenic synergize to eradicate leukemic cells in a mouse model of acute promyelocytic leukemia.
,
J Exp Med
,
1999
, vol.
189
7
(pg.
1043
-
1052
)
122
Leung
J
Pang
A
Yuen
WH
Kwong
YL
Tse
EWC
,
Relationship of expression of aquaglyceroporin 9 with arsenic uptake and sensitivity in leukemia cells.
,
Blood
,
2007
, vol.
109
2
(pg.
740
-
746
)
123
Guillemin
MC
Raffoux
E
Vitoux
D
et al.
,
In vivo activation of cAMP signaling induces growth arrest and differentiation in acute promyelocytic leukemia.
,
J Exp Med
,
2002
, vol.
196
10
(pg.
1373
-
1380
)
124
Zhu
Q
Zhang
JW
Zhu
HQ
et al.
,
Synergic effects of arsenic trioxide and cAMP during acute promyelocytic leukemia cell maturation subtends a novel signaling cross-talk.
,
Blood
,
2002
, vol.
99
3
(pg.
1014
-
1022
)
125
Nasr
R
Lallemand-Breitenbach
V
Zhu
J
Guillemin
MC
de The
H
,
Therapy-induced PML/RARA proteolysis and acute promyelocytic leukemia cure.
,
Clin Cancer Res
,
2009
, vol.
15
20
(pg.
6321
-
6326
)
126
Nasr
R
de The
H
,
Eradication of acute promyelocytic leukemia-initiating cells by PML/RARA-targeting.
,
Int J Hematol
,
2010
, vol.
91
5
(pg.
742
-
747
)
127
Zhao
Q
Tao
J
Zhu
Q
et al.
,
Rapid induction of cAMP/PKA pathway during retinoic acid-induced acute promyelocytic leukemia cell differentiation.
,
Leukemia
,
2004
, vol.
18
2
(pg.
285
-
292
)
128
Tarrade
A
Bastien
J
Bruck
N
et al.
,
Retinoic acid and arsenic trioxide cooperate for apoptosis through phosphorylated RXR alpha.
,
Oncogene
,
2005
, vol.
24
14
(pg.
2277
-
2288
)
129
Pendino
F
Flexor
M
Delhommeau
F
et al.
,
Retinoids down-regulate telomerase and telomere length in a pathway distinct from leukemia cell differentiation.
,
Proc Natl Acad Sci U S A
,
2001
, vol.
98
12
(pg.
6662
-
6667
)
130
Tarkanyi
I
Dudognon
C
Hillion
J
et al.
,
Retinoid/arsenic combination therapy of promyelocytic leukemia: induction of telomerase-dependent cell death.
,
Leukemia
,
2005
, vol.
19
10
(pg.
1806
-
1811
)
131
Zheng
PZ
Wang
KK
Zhang
QY
et al.
,
Systems analysis of transcriptome and proteome in retinoic acid/arsenic trioxide-induced cell differentiation/apoptosis of promyelocytic leukemia.
,
Proc Natl Acad Sci U S A
,
2005
, vol.
102
21
(pg.
7653
-
7658
)
132
Liu
YF
Zhu
YM
Shi
ZZ
et al.
,
Long-term follow-up confirms the benefit of all-trans retinoic acid (ATRA) and arsenic trioxide (As2O3) as front line therapy for newly diagnosed acute promyelocytic leukemia [abstract].
,
Blood
,
2006
, vol.
108
11
Abstract 565
133
Estey
E
Garcia-Manero
G
Ferrajoli
A
et al.
,
Use of all-trans retinoic acid plus arsenic trioxide as an alternative to chemotherapy in untreated acute promyelocytic leukemia.
,
Blood
,
2006
, vol.
107
9
(pg.
3469
-
3473
)
134
Wang
G
Li
W
Cui
J
et al.
,
An efficient therapeutic approach to patients with acute promyelocytic leukemia using a combination of arsenic trioxide with low-dose all-trans retinoic acid.
,
Hematol Oncol
,
2004
, vol.
22
2
(pg.
63
-
71
)
135
,
Formularies for 52 Kinds of Disorders (Originally published in the spring and autumn and the warring states periods of China, 600 BC-400 BC). Reproduced by: Group for Management of the Silk Book in Mawangdui Han Dynasty Tomb.
,
1979
Beijing, China
Culture Relics Press
136
The Cooperation Group of Phase II Clinical Trial of Compound Huangdai Tablet
,
Phase II clinical trial of compound Huangdai tablet in newly diagnosed acute promyelocytic leukemia.
,
Chin J Hematol
,
2006
, vol.
27
(pg.
801
-
804
)
137
Xiang
Y
Huang
SL
Guo
A
et al.
,
The influence on long-term survey of the patients with acute promyelocytic leukemia treated with compound huangdai tablets and chemotherapy.
,
Chin J Clin Hematol
,
2007
, vol.
16
5
(pg.
204
-
206
)
138
Zhou
A
,
Qing-Huang-San (Realgar in combination with Indigo) in treatment of leukemia.
,
Chin J Integr Tradit West Med
,
1998
, vol.
18
(pg.
582
-
583
)
139
Wang
L
Zhou
GB
Liu
P
et al.
,
Dissection of mechanisms of Chinese medicinal formula Realgar-Indigo naturalis as an effective treatment for promyelocytic leukemia.
,
Proc Natl Acad Sci U S A
,
2008
, vol.
105
12
(pg.
4826
-
4831
)
140
Carracedo
A
Ma
L
Teruya-Feldstein
J
et al.
,
Inhibition of mTORC1 leads to MAPK pathway activation through a PI3K-dependent feedback loop in human cancer.
,
J Clin Invest
,
2008
, vol.
118
9
(pg.
3065
-
3074
)
141
Chu
S
Holtz
M
Gupta
M
Bhatia
R
,
BCR/ABL kinase inhibition by imatinib mesylate enhances MAP kinase activity in chronic myelogenous leukemia CD34+ cells.
,
Blood
,
2004
, vol.
103
8
(pg.
3167
-
3174
)
142
Piloto
O
Wright
M
Brown
P
et al.
,
Prolonged exposure to FLT3 inhibitors leads to resistance via activation of parallel signaling pathways.
,
Blood
,
2007
, vol.
109
4
(pg.
1643
-
1652
)
143
Altman
JK
Yoon
P
Katsoulidis
E
et al.
,
Regulatory effects of mammalian target of rapamycin-mediated signals in the generation of arsenic trioxide responses.
,
J Biol Chem
,
2008
, vol.
283
4
(pg.
1992
-
2001
)
144
Hayakawa
F
Privalsky
ML
,
Phosphorylation of PML by mitogen-activated protein kinases plays a key role in arsenic trioxide-mediated apoptosis.
,
Cancer Cell
,
2004
, vol.
5
4
(pg.
389
-
401
)
145
Lunghi
P
Tabilio
A
Lo-Coco
F
Pelicci
PG
Bonati
A
,
Arsenic trioxide (ATO) and MEK1 inhibition synergize to induce apoptosis in acute promyelocytic leukemia cells.
,
Leukemia
,
2005
, vol.
19
2
(pg.
234
-
244
)
146
Lunghi
P
Costanzo
A
Levrero
M
Bonati
A
,
Treatment with arsenic trioxide (ATO) and MEK1 inhibitor activates the p73-p53AIP1 apoptotic pathway in leukemia cells.
,
Blood
,
2004
, vol.
104
2
(pg.
519
-
525
)
147
Lunghi
P
Costanzo
A
Salvatore
L
et al.
,
MEK1 inhibition sensitizes primary acute myelogenous leukemia to arsenic trioxide-induced apoptosis.
,
Blood
,
2006
, vol.
107
11
(pg.
4549
-
4553
)
148
Lunghi
P
Giuliani
N
Mazzera
L
et al.
,
Targeting MEK/MAPK signal transduction module potentiates ATO-induced apoptosis in multiple myeloma cells through multiple signaling pathways.
,
Blood
,
2008
, vol.
112
6
(pg.
2450
-
2462
)
149
Ren
R
,
Mechanisms of BCR-ABL in the pathogenesis of chronic myelogenous leukaemia.
,
Nat Rev Cancer
,
2005
, vol.
5
3
(pg.
172
-
183
)
150
Druker
BJ
Guilhot
F
O'Brien
SG
et al.
,
Five-year follow-up of patients receiving imatinib for chronic myeloid leukemia.
,
N Engl J Med
,
2006
, vol.
355
23
(pg.
2408
-
2417
)
151
Michor
F
Hughes
TP
Iwasa
Y
et al.
,
Dynamics of chronic myeloid leukaemia.
,
Nature
,
2005
, vol.
435
7046
(pg.
1267
-
1270
)
152
Gorre
ME
Mohammed
M
Ellwood
K
et al.
,
Clinical resistance to STI-571 cancer therapy caused by BCR-ABL gene mutation or amplification.
,
Science
,
2001
, vol.
293
5531
(pg.
876
-
880
)
153
Copland
M
Hamilton
A
Elrick
LJ
et al.
,
Dasatinib (BMS-354825) targets an earlier progenitor population than imatinib in primary CML but does not eliminate the quiescent fraction.
,
Blood
,
2006
, vol.
107
11
(pg.
4532
-
4539
)
154
Azam
M
Latek
RR
Daley
GQ
,
Mechanisms of autoinhibition and STI-571/imatinib resistance revealed by mutagenesis of BCR-ABL.
,
Cell
,
2003
, vol.
112
6
(pg.
831
-
843
)
155
Shah
NP
Nicoll
JM
Nagar
B
et al.
,
Multiple BCR-ABL kinase domain mutations confer polyclonal resistance to the tyrosine kinase inhibitor imatinib (STI571) in chronic phase and blast crisis chronic myeloid leukemia.
,
Cancer Cell
,
2002
, vol.
2
2
(pg.
117
-
125
)
156
Donato
NJ
Wu
JY
Stapley
J
et al.
,
BCR-ABL independence and LYN kinase overexpression in chronic myelogenous leukemia cells selected for resistance to STI571.
,
Blood
,
2003
, vol.
101
2
(pg.
690
-
698
)
157
Druker
BJ
Sawyers
CL
Kantarjian
H
et al.
,
Activity of a specific inhibitor of the BCR-ABL tyrosine kinase in the blast crisis of chronic myeloid leukemia and acute lymphoblastic leukemia with the Philadelphia chromosome.
,
N Engl J Med
,
2001
, vol.
344
14
(pg.
1038
-
1042
)
158
Kerkela
R
Grazette
L
Yacobi
R
et al.
,
Cardiotoxicity of the cancer therapeutic agent imatinib mesylate.
,
Nat Med
,
2006
, vol.
12
8
(pg.
908
-
916
)
159
Hu
Z
Pan
XF
Wu
FQ
et al.
,
Synergy between proteasome inhibitors and imatinib mesylate in chronic myeloid leukemia.
,
PLoS ONE
,
2009
, vol.
4
7
pg.
e6257
160
O'Dwyer
M
,
Multifaceted approach to the treatment of bcr-abl-positive leukemias.
,
Oncologist
,
2002
, vol.
7
Suppl 1
(pg.
30
-
38
)
161
Nimmanapalli
R
Bali
P
O'Bryan
E
et al.
,
Arsenic trioxide inhibits translation of mRNA of bcr-abl, resulting in attenuation of Bcr-Abl levels and apoptosis of human leukemia cells.
,
Cancer Res
,
2003
, vol.
63
22
(pg.
7950
-
7958
)
162
Zhang
QY
Mao
JH
Liu
P
et al.
,
A systems biology understanding of the synergistic effects of arsenic sulfide and imatinib in BCR/ABL-associated leukemia.
,
Proc Natl Acad Sci U S A
,
2009
, vol.
106
9
(pg.
3378
-
3383
)
163
Yin
T
Wu
YL
Sun
HP
et al.
,
Combined effects of As4S4 and imatinib on chronic myeloid leukemia cells and BCR-ABL oncoprotein.
,
Blood
,
2004
, vol.
104
13
(pg.
4219
-
4225
)
164
La Rosee
P
Johnson
K
O'Dwyer
ME
Druker
BJ
,
In vitro studies of the combination of imatinib mesylate (Gleevec) and arsenic trioxide (Trisenox) in chronic myelogenous leukemia.
,
Exp Hematol
,
2002
, vol.
30
7
(pg.
729
-
737
)
165
Du
Y
Wang
K
Fang
H
et al.
,
Coordination of intrinsic, extrinsic, and endoplasmic reticulum-mediated apoptosis by imatinib mesylate combined with arsenic trioxide in chronic myeloid leukemia.
,
Blood
,
2006
, vol.
107
4
(pg.
1582
-
1590
)
166
Berenson
JR
Boccia
R
Siegel
D
et al.
,
Efficacy and safety of melphalan, arsenic trioxide and ascorbic acid combination therapy in patients with relapsed or refractory multiple myeloma: a prospective, multicentre, phase II, single-arm study.
,
Br J Haematol
,
2006
, vol.
135
2
(pg.
174
-
183
)
167
Abou-Jawde
RM
Reed
J
Kelly
M
et al.
,
Efficacy and safety results with the combination therapy of arsenic trioxide, dexamethasone, and ascorbic acid in multiple myeloma patients: a phase 2 trial.
,
Med Oncol
,
2006
, vol.
23
2
(pg.
263
-
272
)
168
Wu
KL
Beksac
M
van Droogenbroeck
J
et al.
,
Phase II multicenter study of arsenic trioxide, ascorbic acid and dexamethasone in patients with relapsed or refractory multiple myeloma.
,
Haematologica
,
2006
, vol.
91
12
(pg.
1722
-
1723
)
169
Berenson
JR
Matous
J
Swift
RA
et al.
,
A Phase I/II study of arsenic trioxide/bortezomib/ascorbic acid combination therapy for the treatment of relapsed or refractory multiple myeloma.
,
Clin Cancer Res
,
2007
, vol.
13
6
(pg.
1762
-
1768
)
170
Hermine
O
Dombret
H
Poupon
J
et al.
,
Phase II trial of arsenic trioxide and alpha interferon in patients with relapsed/refractory adult T-cell leukemia/lymphoma.
,
Hematol J
,
2004
, vol.
5
2
(pg.
130
-
134
)
171
Kchour
G
Tarhini
M
Kooshyar
MM
et al.
,
Phase 2 study of the efficacy and safety of the combination of arsenic trioxide, interferon alpha, and zidovudine in newly diagnosed chronic adult T-cell leukemia/lymphoma (ATL).
,
Blood
,
2009
, vol.
113
26
(pg.
6528
-
6532
)
172
Schiller
GJ
Slack
J
Hainsworth
JD
et al.
,
Phase II multicenter study of arsenic trioxide in patients with myelodysplastic syndromes.
,
J Clin Oncol
,
2006
, vol.
24
16
(pg.
2456
-
2464
)
173
Vey
N
Bosly
A
Guerci
A
et al.
,
Arsenic trioxide in patients with myelodysplastic syndromes: a phase II multicenter study.
,
J Clin Oncol
,
2006
, vol.
24
16
(pg.
2465
-
2471
)
174
Zheng
WL
Zhang
GS
Xu
YX
et al.
,
Arsenic trioxide, thalidomide and retinoid acid combination therapy in higher risk myelodysplastic syndrome patients.
,
Leuk Res
,
2008
, vol.
32
2
(pg.
251
-
254
)
175
Chang
JE
Voorhees
PM
Kolesar
JM
et al.
,
Phase II study of arsenic trioxide and ascorbic acid for relapsed or refractory lymphoid malignancies: a Wisconsin Oncology Network study.
,
Hematol Oncol
,
2009
, vol.
27
1
(pg.
11
-
16
)
176
Bazarbachi
A
El-Sabban
ME
Nasr
R
et al.
,
Arsenic trioxide and interferon-alpha synergize to induce cell cycle arrest and apoptosis in human T-cell lymphotropic virus type I-transformed cells.
,
Blood
,
1999
, vol.
93
1
(pg.
278
-
283
)
177
Nasr
R
Rosenwald
A
El-Sabban
ME
et al.
,
Arsenic/interferon specifically reverses 2 distinct gene networks critical for the survival of HTLV-1-infected leukemic cells.
,
Blood
,
2003
, vol.
101
11
(pg.
4576
-
4582
)
178
El-Sabban
ME
Nasr
R
Dbaibo
G
et al.
,
Arsenic-interferon-alpha-triggered apoptosis in HTLV-I transformed cells is associated with tax down-regulation and reversal of NF-kappa B activation.
,
Blood
,
2000
, vol.
96
8
(pg.
2849
-
2855
)
179
El Hajj
H
El-Sabban
M
Hasegawa
H
et al.
,
Therapy-induced selective loss of leukemia-initiating activity in murine adult T cell leukemia.
,
J Exp Med
,
2010
, vol.
207
13
(pg.
2785
-
2792
)
180
Emadi
A
Gore
SD
,
Arsenic trioxide–an old drug rediscovered.
,
Blood Rev
,
2007
, vol.
24
4–5
(pg.
191
-
199
)
181
Westervelt
P
Brown
RA
Adkins
DR
et al.
,
Sudden death among patients with acute promyelocytic leukemia treated with arsenic trioxide.
,
Blood
,
2001
, vol.
98
2
(pg.
266
-
271
)
182
Mathews
V
George
B
Lakshmi
KM
et al.
,
Single-agent arsenic trioxide in the treatment of newly diagnosed acute promyelocytic leukemia: durable remissions with minimal toxicity.
,
Blood
,
2006
, vol.
107
7
(pg.
2627
-
2632
)
183
Luesink
M
Pennings
JLA
Wissink
WM
et al.
,
Chemokine induction by all-trans retinoic acid and arsenic trioxide in acute promyelocytic leukemia: triggering the differentiation syndrome.
,
Blood
,
2009
, vol.
114
27
(pg.
5512
-
5521
)
Sign in via your Institution