Polymorphisms in folate pathway genes may influence the susceptibility to acute lymphoblastic leukemia (ALL). DNA was isolated from 245 pediatric ALL patients (cases) and from 500 blood bank donors (controls). Polymorphisms in methylene-tetrahydrofolate reductase (MTHFR 677C>T, 1298A>C), methionine synthase (MTR 2756A>G), methionine synthase reductase (MTRR 66A>G), methylenetetrahydrofolate dehydrogenase (MTHFD1 1958G>A), nicotinamide N-methyltransferase (NNMT IVS −151C>T), serine hydroxymethyl transferase (SHMT1 1420C>T), thymidylate synthase (TS 2R3R), and the reduced folate carrier (RFC1 80G>A) were detected. In ALL patients, an increased occurrence was observed of the RFC1 80AA variant (odds ratio [OR] = 2.1; 95% confidence interval [CI] = 1.3-3.2; P = .002) and the RFC1 80A allele (OR = 1.5; 95% CI, 1.1-2.1; P = .02). Likewise, the NNMT IVS −151TT genotype showed a 2.2-fold increased ALL risk (OR = 2.2; 95% CI, 1.1-4.6; P = .04). A 1.4-fold reduction in ALL risk was observed for (heterozygous or homozygous) carriers of the TS 2R allele and the MTHFR 677T allele (OR = 0.7; 95% CI, 0.5-1.0; P < .05). Furthermore, interactions between NNMT and MTHFR 677C>T and RFC1 were observed. NNMT IVS −151CC/MTHFR 677CT + TT patients exhibited a 2-fold reduction in ALL risk whereas RFC1 80AA/NNMT IVS −151CT + TT subjects had a 4.2-fold increase in ALL risk (P = .001). For the first time, we associate the RFC1 80G>A and NNMT IVS −151C>T variants to an increased ALL susceptibility.

Folate metabolism is essential for cellular functioning because it provides one-carbon donors for the synthesis of de novo purines and pyrimidines necessary for RNA and DNA synthesis, the remethylation of homocysteine, and methylation reactions (eg, DNA methylation). Folate metabolism may become deranged by inadequate nutrition, altered cellular transport, and polymorphisms in folate-related genes. Several polymorphisms in folate-related genes have been described (Figure 1), although the biochemical consequences of most of these genes are unclear. However, 2 genetic variants in methylenetetrahydrofolate reductase (MTHFR 677 C>T and 1298 A>C) reduce enzyme activity, and the MTHFR 677TT variant also alters normal intracellular folate distribution: folates committed to purine and pyrimidine synthesis accumulate at the expense of 5-methyltetrahydrofolate (the most abundant form in wild-type MTHFR 677 CC subjects).1-3  The effects of other polymorphisms in folate-related genes on folate metabolism are unclear. However, the TS 3R/3R variant has been associated with an increased transcriptional activity in in vitro assays4 ; in tumor cells, no relation with enzyme activity was found5  in contrast to normal cells in which TS 3R/3R was associated with a higher activity than TS 2R/2R.

Figure 1

Simplified scheme depicting intracellular metabolism of folates. THF indicates tetrahydrofolate; DHF, dihydrofolate; CH2-THF, methylene-THF; CH3-THF, methyl-THF; SAM, S-adenosylmethionine; SAH, S-adenosylhomocysteine; dTMP, deoxy thymidine monophosphate; dUMP, deoxy uridine monophosphate; TS, thymidylate synthase; MTHFR, methylenetetrahydrofolate reductase; MTHFD, methylenetetrahydrofolate dehydrogenase; MTR, methionine synthase; MTRR, methionine synthase reductase; SHMT, serine-hydroxymethyltransferase; DHFR, dihydrofolate reductase; RFC, reduced folate carrier; FR, folate receptors, and MTG-PG, methotrexate-polyglutamate. Food folate (CH3-THF) and MTX enter the cell by way of FR or the RFC.

Figure 1

Simplified scheme depicting intracellular metabolism of folates. THF indicates tetrahydrofolate; DHF, dihydrofolate; CH2-THF, methylene-THF; CH3-THF, methyl-THF; SAM, S-adenosylmethionine; SAH, S-adenosylhomocysteine; dTMP, deoxy thymidine monophosphate; dUMP, deoxy uridine monophosphate; TS, thymidylate synthase; MTHFR, methylenetetrahydrofolate reductase; MTHFD, methylenetetrahydrofolate dehydrogenase; MTR, methionine synthase; MTRR, methionine synthase reductase; SHMT, serine-hydroxymethyltransferase; DHFR, dihydrofolate reductase; RFC, reduced folate carrier; FR, folate receptors, and MTG-PG, methotrexate-polyglutamate. Food folate (CH3-THF) and MTX enter the cell by way of FR or the RFC.

Close modal

Low folate status or redistribution of folate vitamers may influence the risk of cancer6  through mechanisms of uracil misincorporation into DNA, possibly leading to double-strand breaks and chromosomal damage7  and DNA hypomethylation/dysmethylation8  of, for example, proto-oncogenes or tumor-suppressor genes. DNA hypomethylation and uracil misincorporation are considered important factors in carcinogenesis.9,10  The most studied gene variants in folate metabolism in relation to the risk of acute lymphoblastic leukemia (ALL) are MTHFR 677C>T and MTHFR 1298A>C (Figure 1). Both MTHFR variants reduce the susceptibility to adult and childhood lymphoid leukemia but not myeloid leukemia.11-18  However, studies investigating the effects of other polymorphisms within the folate pathway on risk of ALL are scarce and are relatively underpowered. Patients carrying variants in serine hydroxymethyl transferase (SHMT1 1420T allele) and thymidylate synthase gene (TS 3R variant) also appear to have a lower risk of ALL.19,20  Furthermore, both variants show interaction: in combination with SHMT1 1420CT/TT, patients with a variant in methionine synthase (MTR 2756AG genotype) showed a 5.6-fold reduction in adult ALL risk.19 MTR 2756G was a risk allele for ALL on itself but also in combination with the MTHFR 677T allele in adults in another study.18  Thus, the aim of this study is to investigate folate pathway polymorphisms other than those in MTHFR in a relatively large group of 245 ALL patients. The hypothesis of this study is that derangements in the patient's cellular folate status by polymorphisms in folate-related genes influence the susceptibility to ALL via reduced uptake or shifts in cellular distribution of folates.

Patients and samples

From 245 newly diagnosed West European pediatric ALL patients (< 18 years), DNA was obtained from unstained cytospin slides. Informed consent was obtained from all patients in accordance with the institutional guidelines and the Declaration of Helsinki. The ethical committees of all participating institutions approved the protocol. Leukemic blast samples were collected at the time of diagnosis. The mononuclear cell fraction was separated by density gradient centrifugation (Lymphoprep, 1.077 g/mL; Nycomed Pharma, Oslo, Norway). All samples contained more than 90% leukemic cells. Cytospins were made of 25 × 103 cells by centrifugation at 680 rpm for 7 minutes. Cytospins were wrapped in foil and stored at −20°C. To isolate DNA, bleached cotton was sterilized in an autoclave and cut into small pieces (0.5 × 0.5 cm). The pieces of cotton were first prewetted with H2O. Under sterile conditions, the leukemic blasts were then isolated by wiping the slides with the wetted cotton using forceps. Hereby the blasts became attached to the cotton. To be sure that as many blasts as possible were taken off the slide, a second piece of cotton was then used in an identical way. The 2 pieces of cotton were put in an Eppendorf vial, and 200 μL phosphate buffered saline was added. The vials were stored at 4°C until DNA isolation. Control DNA was obtained with informed consent from 500 white blood bank donors in Rotterdam, The Netherlands. DNA was obtained from ethylenediaminetetraacetic acid whole-blood in the control group. Genomic DNA was isolated using the QIAamp DNA Mini Kit (QIAGEN, Hilden, Germany) according to the manufacturer's instructions.

Folate pathway polymorphisms

Polymorphisms in folate-related genes were determined as previously described (Figure 1).21  The genetic variants in methylenetetrahydrofolate reductase (MTHFR 677C>T, MTHFR 1298A>C), methionine synthase (MTR 2756A>G), serine hydroxymethyl transferase (SHMT1 1420C>T), and the reduced folate carrier (RFC1 80G>A) were determined with polymerase chain reaction (PCR)–restriction fragment length polymorphism (RFLP). Double (2R2R) or triple (3R3R) 28-bp tandem repeats in the promoter region of the thymidylate synthase gene (TS 2R3R) were visualized on agarose gel directly after the PCR reaction. The polymorphism in the methionine synthase reductase gene (MTRR 66A>G) was determined with real-time PCR using hybridization probes and Lightcycler Technology (Roche Diagnostics, Mannheim, Germany). The variant in the nicotinamide N-methyltransferase gene (NNMT IVS −151C>T) was determined with TaqMan technology (assay on demand).

Statistical analysis

Univariate logistic regression analysis was performed to obtain odds ratios (ORs) and 95% confidence intervals (CIs) to estimate relative risks for each polymorphism independently. Then, potential bivariate interaction between polymorphisms was explored using multiplicative interaction terms in a logistic regression model. Interactions with a P value less than .2 were further explored. To increase power, sometimes the heterozygous and homozygous mutant groups were combined. All analyses were carried out using SPSS, version 11.0, to calculate ORs and CIs. Stratification of the cases according to immunophenotype was not performed because smaller numbers gave insufficient power to detect significant differences.

Of the 245 patients, 60% were male and 40% female. The phenotype distribution was 75% (precursor-) B-ALL (61.8% common-ALL, 33.7% pre–B-ALL, 3.9% pro–B-ALL, and 0.6% B-ALL) and 25% T-ALL. The genotype distribution of the folate pathway gene polymorphisms and the univariate risk estimates compared with the wild-type genotype are depicted in Table 1. All genotype distributions in the controls and the patients were in Hardy-Weinberg equilibrium, except for NNMT in ALL patients (P = .04)

Table 1

Distribution of genotypes in childhood ALL patients and controls

VariantGenotypeALL cases, no. (%)Controls, no. (%)OR (95% CI)P
MTHFR 677C>T     
    CC 130 (53.1) 219 (44.2)  
    CT 93 (38.0) 223 (45.0) 0.7 (0.5-1.0) .03* 
    TT 22 (9.0) 54 (10.9) 0.7 (0.4-1.2) .17 
    CT + TT 115 (46.9) 277 (55.8) 0.7 (0.5-1.0) .02* 
MTHFR 1298A>C     
    AA 110 (44.9) 229 (47.0)  
    AC 100 (40.8) 213 (43.7) 1.0 (0.7-1.4) .89 
    CC 35 (14.3) 45 (9.2) 1.6 (1.0-2.7) .06 
    AC + CC 135 (55.1) 258 (52.9) 1.1 (0.8-1.5) .57 
MTR 2756A>G     
    AA 162 (66.1) 340 (69.5)  
    AG 74 (30.2) 137 (28.0) 1.1 (0.8-1.6) .47 
    GG 9 (3.7) 12 (2.5) 1.6 (0.7-3.8) .32 
    AG + GG 83 (33.9) 149 (30.5) 1.2 (0.8-1.6) .35 
MTRR 66A>G     
    AA 59 (24.4) 101 (20.2)  
    AG 117 (48.3) 245 (49.1) 0.8 (0.6-1.2) .31 
    GG 66 (27.3) 153 (30.7) 0.7 (0.5-1.1) .17 
    AG + GG 183 (75.6) 397 (79.6) 0.8 (0.5-1.1) .20 
SHMT 1420C>T     
    CC 130 (53.3) 232 (46.7)  
    CT 86 (35.2) 213 (42.9) 0.7 (0.5-1.0) .05 
    TT 28 (11.5) 52 (10.5) 1.0 (0.6-1.6) .88 
    CT + TT 114 (46.7) 265 (53.3) 0.8 (0.6-1.0) .09 
RFC 80G>A     
    GG 69 (28.6) 186 (37.6)  
    GA 120 (49.8) 241 (48.7) 1.3 (0.9-1.9) .10 
    AA 52 (21.6) 68 (13.7) 2.1 (1.3-3.2) .002* 
    GA + AA 172 (71.4) 309 (62.4) 1.5 (1.1-2.1) .02* 
TS 2R3R     
    3R3R 80 (32.8) 123 (25.1)  
    3R2R 113 (46.3) 252 (51.3) 0.7 (0.5-1.0) .04* 
    2R2R 51 (20.9) 116 (23.6) 0.7 (0.4-1.0) .08 
    3R2R + 2R2R 164 (67.2) 368 (74.9) 0.7 (0.5-1.0) .03* 
NNMT IVS-151C>T     
    CC 161 (66.0) 354 (71.2)  
    CT 68 (27.9) 128 (25.8) 1.2 (0.8-1.7) .40 
    TT 15 (6.1) 15 (3.0) 2.2 (1.1-4.6) .04* 
    CT + TT 83 (34.0) 143 (28.8) 1.3 (0.9-1.8) .15 
VariantGenotypeALL cases, no. (%)Controls, no. (%)OR (95% CI)P
MTHFR 677C>T     
    CC 130 (53.1) 219 (44.2)  
    CT 93 (38.0) 223 (45.0) 0.7 (0.5-1.0) .03* 
    TT 22 (9.0) 54 (10.9) 0.7 (0.4-1.2) .17 
    CT + TT 115 (46.9) 277 (55.8) 0.7 (0.5-1.0) .02* 
MTHFR 1298A>C     
    AA 110 (44.9) 229 (47.0)  
    AC 100 (40.8) 213 (43.7) 1.0 (0.7-1.4) .89 
    CC 35 (14.3) 45 (9.2) 1.6 (1.0-2.7) .06 
    AC + CC 135 (55.1) 258 (52.9) 1.1 (0.8-1.5) .57 
MTR 2756A>G     
    AA 162 (66.1) 340 (69.5)  
    AG 74 (30.2) 137 (28.0) 1.1 (0.8-1.6) .47 
    GG 9 (3.7) 12 (2.5) 1.6 (0.7-3.8) .32 
    AG + GG 83 (33.9) 149 (30.5) 1.2 (0.8-1.6) .35 
MTRR 66A>G     
    AA 59 (24.4) 101 (20.2)  
    AG 117 (48.3) 245 (49.1) 0.8 (0.6-1.2) .31 
    GG 66 (27.3) 153 (30.7) 0.7 (0.5-1.1) .17 
    AG + GG 183 (75.6) 397 (79.6) 0.8 (0.5-1.1) .20 
SHMT 1420C>T     
    CC 130 (53.3) 232 (46.7)  
    CT 86 (35.2) 213 (42.9) 0.7 (0.5-1.0) .05 
    TT 28 (11.5) 52 (10.5) 1.0 (0.6-1.6) .88 
    CT + TT 114 (46.7) 265 (53.3) 0.8 (0.6-1.0) .09 
RFC 80G>A     
    GG 69 (28.6) 186 (37.6)  
    GA 120 (49.8) 241 (48.7) 1.3 (0.9-1.9) .10 
    AA 52 (21.6) 68 (13.7) 2.1 (1.3-3.2) .002* 
    GA + AA 172 (71.4) 309 (62.4) 1.5 (1.1-2.1) .02* 
TS 2R3R     
    3R3R 80 (32.8) 123 (25.1)  
    3R2R 113 (46.3) 252 (51.3) 0.7 (0.5-1.0) .04* 
    2R2R 51 (20.9) 116 (23.6) 0.7 (0.4-1.0) .08 
    3R2R + 2R2R 164 (67.2) 368 (74.9) 0.7 (0.5-1.0) .03* 
NNMT IVS-151C>T     
    CC 161 (66.0) 354 (71.2)  
    CT 68 (27.9) 128 (25.8) 1.2 (0.8-1.7) .40 
    TT 15 (6.1) 15 (3.0) 2.2 (1.1-4.6) .04* 
    CT + TT 83 (34.0) 143 (28.8) 1.3 (0.9-1.8) .15 

OR indicates odds ratio; and CI, confidence interval.

*

Significant value.

The MTHFR 677CT variant was underrepresented in ALL patients (38%) compared with healthy controls (45%; OR = 0.7; 95% CI, 0.5-1.0; P = .03); T-allele carriers were also significantly lower in ALL cases (47%) than healthy controls (56%), indicating that the T allele is related to a reduced leukemia risk (OR = 0.7; 95% CI, 0.5-1.0; P = .02). Reduced leukemia risk was also observed for the TS 3R2R variant (OR = 0.7; 95% CI, 0.4-1.0; P = .04) and TS 2R allelic carriers (OR = 0.7; 95% CI, 0.5-1.0; P = .03). RFC1 80AA homozygotes and A-allelic carriers have an increased susceptibility to ALL. Risk was increased 2.1 times (95% CI, 1.3-3.2; P = .002) with the RFC1 80AA variant and 1.5 times (95% CI, 1.1-2.1; P = .02) for A-allelic carriers. Similarly, the NNMT IVS −151 TT variant also is associated with increased susceptibility to ALL (OR = 2.2; 95% CI, 1.1-4.6; P = .04). When the T-ALL patients (n = 59) were left out from the univariate analysis, this did not lead to significantly different point estimates of the ORs or the CIs. For example, the OR of the RFC 80 A-allele carriers was 1.4 (95% CI, 0.9-2.0; P = .09); the OR of the MTHFR T-allele carriers was identical to the combined analysis (OR = 0.7; 95% CI, 0.9-2.0; P = .09; Table 1). However, because numbers are lower, P values generally increase.

Then, we tested several gene × gene interactions. There was an interaction between the RFC1 80G>A and NNMT IVS −151 C>T polymorphisms (P = .1). To gain power in the analysis, NNMT −151CT and TT variants were combined because only one case and one control were present in the NNMT IVS −151TT/RFC 80AA genotype. Specifically, among persons with the RFC1 80AA variant, the OR of NNMT IVS −151CT + TT vs −151CC was 4.2 (95% CI, 1.8-9.7; P = .001; Figure 2). Furthermore, the MTHFR 677C>T and NNMT IVS −151C>T variants interacted (P = .004). In carriers of the wild-type NNMT IVS −151CC variant, a significantly reduced risk for ALL was observed for the MTHFR 677CT + TT genotype (OR = 0.5; 95% CI, 0.4-0.8; P = .001; Figure 3). To increase power, NNMT −151CT and TT and MTHFR 677 CT + TT variants were combined in the analyses.

Figure 2

RFC1 80AA and the NNMT IVS −151T allele interact to increase the risk of pediatric acute lymphoblastic leukemia. Odds ratios and 95% confidence intervals for NNMT IVS −151 CT + TT versus CC genotypes at levels of RFC1 80G>A. *P = .001.

Figure 2

RFC1 80AA and the NNMT IVS −151T allele interact to increase the risk of pediatric acute lymphoblastic leukemia. Odds ratios and 95% confidence intervals for NNMT IVS −151 CT + TT versus CC genotypes at levels of RFC1 80G>A. *P = .001.

Close modal
Figure 3

The MTHFR 677T allele and NNMT IVS −151CC interact to decrease the risk of pediatric acute lymphoblastic leukemia. Odds ratios and 95% confidence intervals for NNMT IVS −151 CT + TT versus CC genotypes at levels of MTHFR 677C>T. *P = .001.

Figure 3

The MTHFR 677T allele and NNMT IVS −151CC interact to decrease the risk of pediatric acute lymphoblastic leukemia. Odds ratios and 95% confidence intervals for NNMT IVS −151 CT + TT versus CC genotypes at levels of MTHFR 677C>T. *P = .001.

Close modal

Polymorphisms in folate-related genes may influence cellular folate metabolism by lowering folate status or shifts in cellular folate distribution. This may influence the risk of cancer6  through several mechanisms. First, low availability of folates or redistribution of folates toward homocysteine remethylation reduces availability of folates for the TS reaction and DNA synthesis (Figure 1) and results in uracil misincorporation into DNA, possibly leading to double-strand breaks and chromosomal damage.7  On the other side, reduced availability of folate for the methionine cycle results in reduced transmethylation capacity (low S-adenosylmethionine/S-adenosylhomocysteine ratio, Figure 1) and DNA hypomethylation/dysmethylation8  of, for example, proto-oncogenes or tumor suppressor genes. DNA hypomethylation and uracil misincorporation are considered important factors in carcinogenesis.9,10 

This is the first report that identifies an association between the RFC1 80G>A polymorphism and ALL risk. The RFC1 80G>A variant was the strongest modulator of leukemia risk: risk increased 1.5 times and 2.1 times in A-allelic carriers and 80AA homozygotes, respectively. In addition, a 4.2-fold increased risk of ALL was observed in carriers of the RFC1 80GG/NNMT IVS −151CT + TT genotype. The RFC1 80G>A allele frequency of the 500 blood-bank donors (38%) was similar to earlier reports in 169 healthy French adults (36%),22  602 healthy English children (41%),23  and 1041 healthy English elderly people (44%).24  The RFC1 80G>A polymorphism results in a change of arginine-27 to histidine-27. However, the functional effect of the 80G>A variant is scarcely investigated. Whetstine et al25  investigated the transport properties of this genetic polymorphism in K562 cells, and these in vitro experiments suggest that the RFC1 80G>A polymorphism has marginal functional effects. Cellular uptake of most oxidized folates, such as folic acid, is predominantly mediated by the folate receptor and not via the RFC. Thus, whether these in vitro results can be translated to the human in vivo situation is questionable and hardly investigated. Interestingly, patients carrying the polymorphic RFC1 80A allele showed an increased percentage of extracellular folate relative to intracellular folate.26  This observation suggests that the RFC1 80G>A polymorphism renders a reduced efficiency in the cellular uptake of methyl-THF. Similarly, mean plasma folate was slightly higher in healthy subjects carrying the RFC1 80AA variant: 19 nmol/L versus 15 nmol/L in G-allelic carriers.22  Whether the RFC1 80G>A variant induces shifts in intracellular folate redistribution is not known. In addition, other regulating factors in cellular folate metabolism might counteract the diminished influx. Thus, patients carrying the RFC1 80A allele may have lower folate or methotrexate (MTX) uptake, which might increase ALL risk and decrease MTX efficacy. Interestingly, the RFC1 gene is located on chromosome 21. Extra copies of this chromosome in favorable subgroups of ALL are associated with enhanced RFC1 mRNA expression and MTX-PG accumulation27,28  and, hence, may be a selective advantage. Earlier studies did not show a relation between the RFC1 80G>A polymorphism and the risk of non–Hodgkin lymphoma,29,30  neural tube defects,23,31  and colon cancer.32  However, the RFC1 A allele is associated with an increased risk of distal gastric cancer,33  whereas the maternal RFC1 G allele increases the risk of offspring with Down syndrome, especially in combination with the MTHFR 1298C allele.34-36  Interestingly, the RFC1 80A allele has been associated with antifolate toxicity in children with ALL,37  although we did not find altered MTX sensitivity21  or toxicity38  associated with this polymorphism.

The most studied gene variants in folate metabolism in relation to cancer risk are the 677C>T and the 1298A>C polymorphisms in the MTHFR gene. The 677TT and the 1298CC variants are associated with moderately reduced risks for colorectal cancer.39  Both MTHFR variants also reduce the susceptibility to adult and childhood lymphoid leukemia but not myeloid leukemia.11-18  A recent meta-analysis concluded that MTHFR 677TT reduces risk of adult ALL but not childhood ALL; the MTHFR 1298A>C polymorphism did not influence susceptibility to childhood or adult ALL.40  In line with this recent meta-analysis,40  we observed no protective effect of the MTHFR 1298A>C variant on ALL risk. In the present study, MTHFR 677CT and T-allelic carriers exhibited decreased risk of ALL. Moreover, MTHFR 677C>T interacted with NNMT IVS −151C>T: a 49% reduction in ALL risk was observed for patients carrying the MTHFR CT + TT/NNMT IVS −151CC genotype. Discrepant literature results for the MTHFR variants may have to do with the folate status of the patients. Few studies investigated the role of gene-environment interactions on the risk of childhood ALL. Both increased folate intake,41,42  and the MTHFR 677C>T and 1298A>C polymorphisms12,13,16,17  separately are related to a reduced susceptibility to ALL. Krajinovic et al16  investigated gene-environment interaction by grouping the children into those born before or after 1996, the time of the recommendation of folic acid supplementation during pregnancy in Canada. They observed that the protective effect of the MTHFR polymorphisms was only present in those born before 1996 and that the protective effect disappeared in (folate replete) subjects born after this date. Because the year of birth is a surrogate marker of the folate status, more studies are necessary that measure plasma and erythrocyte folate levels together with polymorphisms in folate-related genes to study the influence of gene-environment interactions on ALL risk. Similarly, MTHFR 677TT increases gastric cancer risk in subjects with low folate status but not in folate replete subjects.43  Another possibility that is hardly explored is that pediatric ALL risk is modulated by the folate status of the mother during pregnancy. Against this hypothesis is the observation that the effects of the MTHFR 677C>T and 1298A>C genotypes on ALL risk were abolished when parental genotypes were compared with controls.16  The authors concluded that it is the patient's genotype that determines leukemia risk. The biochemical consequences of both the MTHFR 677C>T and 1298A>C variants are best characterized. The MTHFR 677C>T polymorphism yields a thermolabile enzyme with approximately 30% and 60% residual activity for the TT and CT variants, respectively.44  The variant lies at the base of the binding site for the MTHFR cofactor, flavin adenine dinucleotide. The 677TT variant increases total homocysteine by approximately 25%,44,45  especially when folate status is low,46  and influences folate redistribution and TS flux.1-3  The other variant in the MTHFR gene, 1298A>C, also decreases enzyme activity,47-49  although to a lesser extent than the 677C>T variant.50  The 1298A>C variant lies in the S-adenosylmethionine-regulatory domain of the enzyme and seems not to affect total homocysteine.48-50 

Polymorphisms other than those in the MTHFR gene are scarcely studied, and results are contradictory. Patients carrying the SHMT1 1420T allele and the TS 3R variant have a lower risk of ALL19,20 ; furthermore, both variants show interaction. In our study, we could not confirm the protective effect of the TS 3R variant. Instead, we observed a protective effect of the TS 2R variant. Thus, because of the relatively small sample sizes of our study (n = 245) and that of Skibola et al19  (n-71) and Hishida et al20  (n = 108), the reported and contrasting effects may be the result of chance. More studies are needed to elucidate the effect of the TS 2R3R polymorphism on leukemia risk. In line with previous studies,19,20  we also observed trends to protective effects of the SHMT1 1420CT variant (P = .05) and T-allelic carriers (P = .09).

Both in our study and in other studies,13,19  the MTR 2756A>G variant does not modulate ALL risk in univariate analysis. However, in combination with SHMT1 1420CT/TT, patients with the MTR 2756AG variant showed a 5.6-fold reduction in ALL risk.19  In contrast, MTR 2756G was a risk allele for ALL on itself but also in combination with the MTHFR 677T allele in adults.18  We could not confirm these observed interactions between the MTR 2756A>G and SHMT1 1420C>T or MTHFR 677C>T polymorphisms. The MTRR 66A>G variant was unrelated to ALL risk in our study and in the study of Gemmati et al,18  although only in the latter study were significant interaction effects on ALL risk with the MTR 2756AG/GG and MTHFR 677TT genotypes observed.

A genome-wide study51  identified NNMT IVS −151C>T as the major determinant of plasma homocysteine. Little is known about the functional effects of this polymorphism. We describe, for the first time, that this NNMT gene variant increases ALL risk and interacts with the MTHFR 677C>T and RFC1 80G>A variants. More studies on this polymorphism are needed. NNMT serum levels are increased in patients with colorectal cancer,52  and NNMT is up-regulated in tumor cells of favorable subgroups of oral squamous cell carcinoma.53 

We are well aware of the risk of spurious findings when using multiple comparisons. However, we controlled chance findings by (1) carefully selecting a priori 8 single nucleotide polymorphisms (SNPs) with documented biologic and/or clinical effects and (2) the selection of SNPs was hypothesis driven. Therefore, we did not adjust for multiple comparisons. A major disadvantage of adjusting for multiple comparisons is that it becomes very hard to detect a possible effect of a promising SNP in a relatively small patient population. Hence, we would increase the risk of throwing out a useful SNP, although indeed there is an effect (type 2 error). When correcting for multiple comparisons, the effect of the homozygous RFC1 80AA variant remained significant. In earlier studies using a subgroup of patients, we demonstrated that polymorphisms in folate-related genes are associated with MTX sensitivity21  and toxicity.38 

MTX uptake/metabolism is different between T-ALL and B-ALL patients, as we have shown.54  MTX polyglutamylation is lower in T-ALL because of lower folylpolyglutamate synthetase activity compared with c/pre–B-ALL. However, whether T-ALL and B-ALL patients also differ in folate kinetics (eg, because of folate polymorphisms) is hardly explored. When we left out the T-ALL patients (n = 59) from the analysis, this did not lead to significantly different results; therefore, T-ALL and B-ALL patients are presented as one group. Future studies with larger numbers of patient will allow better investigation of whether T-ALL and B-ALL patients differ in folate metabolism and how this influences their susceptibility to ALL. Furthermore, we did not assess nutritional status (eg, serum or erythrocyte folate). Future studies should investigate the influence of nutritional status because folate intake most probably interacts with polymorphisms in one-carbon metabolism, as has been shown for MTHFR. Our study shows, in line with several other studies, that folate status should be considered a risk factor for ALL and warrants further research. For comparison of the risk estimates we observed (eg, RFC 80 A allele: OR = 1.5; 95% CI, 1.1-2.1), a recent meta-analysis (n = 10 282) showed that a birth weight more than 4000 g is associated with a higher risk of ALL (OR = 1.26; 95% CI, 1.17-1.37).

In conclusion, the RFC1 and NNMT gene variants are associated with increased ALL risk, whereas the MTHFR and TS gene variants are associated with decreased ALL risk. The underlying mechanisms of the increased ALL risk associated with the RFC1 80G>A and NNMT IVS −151C>T polymorphisms may be reduced cellular uptake of folate and changed methylation status, respectively; the reduced risk associated with the MTHFR 677C>T and TS 2R/3R polymorphisms may be the result of changed intracellular folate redistribution.

The publication costs of this article were defrayed in part by page charge payment. Therefore, and solely to indicate this fact, this article is hereby marked “advertisement” in accordance with 18 USC section 1734.

Contribution: R.d.J. designed research, performed SNP and statistical analysis, and wrote the paper; W.J.E.T. provided patient samples and clinical data and designed research; J.H.H. provided patient samples and helped in setting up DNA analysis and interpretation of data; G.J. provided patient samples and helped in discussion and interpretation; G.J.L.K. provided patient samples; J.L. designed research; G.J.P. helped in setting up DNA analysis, interpretation of data, and discussion; and R.P. designed research and provided patient samples.

Conflict-of-interest disclosure: The authors declare no competing financial interests.

Correspondence: Robert de Jonge, Department of Clinical Chemistry, Erasmus MC (L-137), POB 2040, 3000 CA Rotterdam, The Netherlands; e-mail: r.dejonge@erasmusmc.nl.

1
Bagley
PJ
,
Selhub
J
.
,
A common mutation in the methylenetetrahydrofolate reductase gene is associated with an accumulation of formylated tetrahydrofolates in red blood cells.
,
Proc Natl Acad Sci U S A
,
1998
, vol.
95
(pg.
13217
-
13220
)
2
Sohn
KJ
,
Croxford
R
,
Yates
Z
,
Lucock
M
,
Kim
YI
.
,
Effect of the methylenetetrahydrofolate reductase C677T polymorphism on chemosensitivity of colon and breast cancer cells to 5-fluorouracil and methotrexate.
,
J Natl Cancer Inst
,
2004
, vol.
96
(pg.
134
-
144
)
3
Etienne
MC
,
Ilc
K
,
Formento
JL
, et al.
,
Thymidylate synthase and methylenetetrahydrofolate reductase gene polymorphisms: relationships with 5-fluorouracil sensitivity.
,
Br J Cancer
,
2004
, vol.
90
(pg.
526
-
534
)
4
Horie
N
,
Aiba
H
,
Oguro
K
,
Hojo
H
,
Takeishi
K
.
,
Functional analysis and DNA polymorphism of the tandemly repeated sequences in the 5′-terminal regulatory region of the human gene for thymidylate synthase.
,
Cell Struct Funct
,
1995
, vol.
20
(pg.
191
-
197
)
5
Mauritz
R
,
Beumer
IJ
,
Marsh
S
, et al.
,
Polymorphism of the thymidylate synthase gene and thymidylate synthase levels in colon cancer cell lines and different tissues of colorectal cancer patients.
,
Nucleosides Nucleotides Nucleic Acids
,
2004
, vol.
23
(pg.
1381
-
1384
)
6
Kim
YI
.
,
Folate and carcinogenesis: evidence, mechanisms, and implications.
,
J Nutr Biochem
,
1999
, vol.
10
(pg.
66
-
88
)
7
Blount
BC
,
Mack
MM
,
Wehr
CM
, et al.
,
Folate deficiency causes uracil misincorporation into human DNA and chromosome breakage: implications for cancer and neuronal damage.
,
Proc Natl Acad Sci U S A
,
1997
, vol.
94
(pg.
3290
-
3295
)
8
Das
PM
,
Singal
R
.
,
DNA methylation and cancer.
,
J Clin Oncol
,
2004
, vol.
22
(pg.
4632
-
4642
)
9
Duthie
SJ
,
Narayanan
S
,
Brand
GM
,
Pirie
L
,
Grant
G
.
,
Impact of folate deficiency on DNA stability.
,
J Nutr
,
2002
, vol.
132
suppl
(pg.
2444
-
2449
)
10
Lucock
M.
.
,
Is folic acid the ultimate functional food component for disease prevention?
,
BMJ
,
2004
, vol.
328
(pg.
211
-
214
)
11
Skibola
CF
,
Smith
MT
,
Kane
E
, et al.
,
Polymorphisms in the methylenetetrahydrofolate reductase gene are associated with susceptibility to acute leukemia in adults.
,
Proc Natl Acad Sci U S A
,
1999
, vol.
96
(pg.
12810
-
12815
)
12
Matsuo
K
,
Suzuki
R
,
Hamajima
N
, et al.
,
Association between polymorphisms of folate- and methionine-metabolizing enzymes and susceptibility to malignant lymphoma.
,
Blood
,
2001
, vol.
97
(pg.
3205
-
3209
)
13
Matsuo
K
,
Hamajima
N
,
Suzuki
R
, et al.
,
Methylenetetrahydrofolate reductase gene (MTHFR) polymorphisms and reduced risk of malignant lymphoma.
,
Am J Hematol
,
2004
, vol.
77
(pg.
351
-
357
)
14
Wiemels
JL
,
Smith
RN
,
Taylor
GM
,
Eden
OB
,
Alexander
FE
,
Greaves
MF
.
,
Methylenetetrahydrofolate reductase (MTHFR) polymorphisms and risk of molecularly defined subtypes of childhood acute leukemia.
,
Proc Natl Acad Sci U S A
,
2001
, vol.
98
(pg.
4004
-
4009
)
15
Franco
RF
,
Simoes
BP
,
Tone
LG
,
Gabellini
SM
,
Zago
MA
,
Falcao
RP
.
,
The methylenetetrahydrofolate reductase C677T gene polymorphism decreases the risk of childhood acute lymphocytic leukaemia.
,
Br J Haematol
,
2001
, vol.
115
(pg.
616
-
618
)
16
Krajinovic
M
,
Lamothe
S
,
Labuda
D
, et al.
,
Role of MTHFR genetic polymorphisms in the susceptibility to childhood acute lymphoblastic leukemia.
,
Blood
,
2004
, vol.
103
(pg.
252
-
257
)
17
Robien
K
,
Ulrich
CM
.
,
5,10-Methylenetetrahydrofolate reductase polymorphisms and leukemia risk: a HuGE minireview.
,
Am J Epidemiol
,
2003
, vol.
157
(pg.
571
-
582
)
18
Gemmati
D
,
Ongaro
A
,
Scapoli
GL
, et al.
,
Common gene polymorphisms in the metabolic folate and methylation pathway and the risk of acute lymphoblastic leukemia and non-Hodgkin's lymphoma in adults.
,
Cancer Epidemiol Biomarkers Prev
,
2004
, vol.
13
(pg.
787
-
794
)
19
Skibola
CF
,
Smith
MT
,
Hubbard
A
, et al.
,
Polymorphisms in the thymidylate synthase and serine hydroxymethyltransferase genes and risk of adult acute lymphocytic leukemia.
,
Blood
,
2002
, vol.
99
(pg.
3786
-
3791
)
20
Hishida
A
,
Matsuo
K
,
Hamajima
N
, et al.
,
Associations between polymorphisms in the thymidylate synthase and serine hydroxymethyltransferase genes and susceptibility to malignant lymphoma.
,
Haematologica
,
2003
, vol.
88
(pg.
159
-
166
)
21
de Jonge
R
,
Hooijberg
JH
,
van Zelst
BD
, et al.
,
Effect of polymorphisms in folate-related genes on in vitro methotrexate sensitivity in pediatric acute lymphoblastic leukemia.
,
Blood
,
2005
, vol.
106
(pg.
717
-
720
)
22
Chango
A
,
Emery-Fillon
N
,
de Courcy
GP
, et al.
,
A polymorphism (80G->A) in the reduced folate carrier gene and its associations with folate status and homocysteinemia.
,
Mol Genet Metab
,
2000
, vol.
70
(pg.
310
-
315
)
23
Relton
CL
,
Wilding
CS
,
Pearce
MS
, et al.
,
Gene-gene interaction in folate-related genes and risk of neural tube defects in a UK population.
,
J Med Genet
,
2004
, vol.
41
(pg.
256
-
260
)
24
Devlin
AM
,
Clarke
R
,
Birks
J
,
Evans
JG
,
Halsted
CH
.
,
Interactions among polymorphisms in folate-metabolizing genes and serum total homocysteine concentrations in a healthy elderly population.
,
Am J Clin Nutr
,
2006
, vol.
83
(pg.
708
-
713
)
25
Whetstine
JR
,
Gifford
AJ
,
Witt
T
, et al.
,
Single nucleotide polymorphisms in the human reduced folate carrier: characterization of a high-frequency G/A variant at position 80 and transport properties of the His(27) and Arg(27) carriers.
,
Clin Cancer Res
,
2001
, vol.
7
(pg.
3416
-
3422
)
26
Yates
Z
,
Lucock
M
.
,
G80A reduced folate carrier SNP modulates cellular uptake of folate and affords protection against thrombosis via a non homocysteine related mechanism.
,
Life Sci
,
2005
, vol.
77
(pg.
2735
-
2742
)
27
Belkov
VM
,
Krynetski
EY
,
Schuetz
JD
, et al.
,
Reduced folate carrier expression in acute lymphoblastic leukemia: a mechanism for ploidy but not lineage differences in methotrexate accumulation.
,
Blood
,
1999
, vol.
93
(pg.
1643
-
1650
)
28
Zhang
L
,
Taub
JW
,
Williamson
M
, et al.
,
Reduced folate carrier gene expression in childhood acute lymphoblastic leukemia: relationship to immunophenotype and ploidy.
,
Clin Cancer Res
,
1998
, vol.
4
(pg.
2169
-
2177
)
29
Lightfoot
TJ
,
Skibola
CF
,
Willett
EV
, et al.
,
Risk of non-Hodgkin lymphoma associated with polymorphisms in folate-metabolizing genes.
,
Cancer Epidemiol Biomarkers Prev
,
2005
, vol.
14
(pg.
2999
-
3003
)
30
Skibola
CF
,
Forrest
MS
,
Coppede
F
, et al.
,
Polymorphisms and haplotypes in folate-metabolizing genes and risk of non-Hodgkin lymphoma.
,
Blood
,
2004
, vol.
104
(pg.
2155
-
2162
)
31
Relton
CL
,
Wilding
CS
,
Laffling
AJ
, et al.
,
Low erythrocyte folate status and polymorphic variation in folate-related genes are associated with risk of neural tube defect pregnancy.
,
Mol Genet Metab
,
2004
, vol.
81
(pg.
273
-
281
)
32
Ulrich
CM
,
Curtin
K
,
Potter
JD
,
Bigler
J
,
Caan
B
,
Slattery
ML
.
,
Polymorphisms in the reduced folate carrier, thymidylate synthase, or methionine synthase and risk of colon cancer.
,
Cancer Epidemiol Biomarkers Prev
,
2005
, vol.
14
(pg.
2509
-
2516
)
33
Gotze
T
,
Rocken
C
,
Rohl
FW
, et al.
,
Gene polymorphisms of folate metabolizing enzymes and the risk of gastric cancer.
,
Cancer Lett
,
2007
, vol.
251
(pg.
228
-
236
)
34
Coppede
F
,
Colognato
R
,
Migliore
L
.
,
MTHFR and RFC-1 gene polymorphisms and the risk of Down syndrome in Italy.
,
Am J Med Genet A
,
2007
, vol.
143
(pg.
1018
-
1019
)
35
Coppede
F
,
Marini
G
,
Bargagna
S
, et al.
,
Folate gene polymorphisms and the risk of Down syndrome pregnancies in young Italian women.
,
Am J Med Genet A
,
2006
, vol.
140
(pg.
1083
-
1091
)
36
Scala
I
,
Granese
B
,
Sellitto
M
, et al.
,
Analysis of seven maternal polymorphisms of genes involved in homocysteine/folate metabolism and risk of Down syndrome offspring.
,
Genet Med
,
2006
, vol.
8
(pg.
409
-
416
)
37
Kishi
S
,
Cheng
C
,
French
D
, et al.
,
Ancestry and pharmacogenetics of antileukemic drug toxicity.
,
Blood
,
2007
, vol.
109
(pg.
4151
-
4157
)
38
Huang
L
,
Tissing
WJ
,
de Jonge
R
,
van Zelst
BD
,
Pieters
R
.
,
Polymorphisms in folate-related genes: association with side effects of high-dose methotrexate in childhood acute lymphoblastic leukemia.
,
Leukemia
,
2008
, vol.
22
(pg.
1798
-
1800
)
39
Sharp
L
,
Little
J
.
,
Polymorphisms in genes involved in folate metabolism and colorectal neoplasia: a HuGE review.
,
Am J Epidemiol
,
2004
, vol.
159
(pg.
423
-
443
)
40
Pereira
TV
,
Rudnicki
M
,
Pereira
AC
,
Pombo-de-Oliveira
MS
,
Franco
RF
.
,
5,10-Methylenetetrahydrofolate reductase polymorphisms and acute lymphoblastic leukemia risk: a meta-analysis.
,
Cancer Epidemiol Biomarkers Prev
,
2006
, vol.
15
(pg.
1956
-
1963
)
41
Thompson
JR
,
Gerald
PF
,
Willoughby
ML
,
Armstrong
BK
.
,
Maternal folate supplementation in pregnancy and protection against acute lymphoblastic leukaemia in childhood: a case-control study.
,
Lancet
,
2001
, vol.
358
(pg.
1935
-
1940
)
42
Aplenc
R
,
Thompson
J
,
Han
P
, et al.
,
Methylenetetrahydrofolate reductase polymorphisms and therapy response in pediatric acute lymphoblastic leukemia.
,
Cancer Res
,
2005
, vol.
65
(pg.
2482
-
2487
)
43
Boccia
S
,
Hung
R
,
Ricciardi
G
, et al.
,
Meta- and pooled analyses of the methylenetetrahydrofolate reductase C677T and A1298C polymorphisms and gastric cancer risk: a huge-GSEC review.
,
Am J Epidemiol
,
2008
, vol.
167
(pg.
505
-
516
)
44
Frosst
P
,
Blom
HJ
,
Milos
R
, et al.
,
A candidate genetic risk factor for vascular disease: a common mutation in methylenetetrahydrofolate reductase.
,
Nat Genet
,
1995
, vol.
10
(pg.
111
-
113
)
45
Kluijtmans
LA
,
Boers
GH
,
Trijbels
FJ
,
van Lith-Zanders
HM
,
van den Heuvel
LP
,
Blom
HJ
.
,
A common 844INS68 insertion variant in the cystathionine beta-synthase gene.
,
Biochem Mol Med
,
1997
, vol.
62
(pg.
23
-
25
)
46
Jacques
PF
,
Bostom
AG
,
Williams
RR
, et al.
,
Relation between folate status, a common mutation in methylenetetrahydrofolate reductase, and plasma homocysteine concentrations.
,
Circulation
,
1996
, vol.
93
(pg.
7
-
9
)
47
Weisberg
IS
,
Jacques
PF
,
Selhub
J
, et al.
,
The 1298A–>C polymorphism in methylenetetrahydrofolate reductase (MTHFR): in vitro expression and association with homocysteine.
,
Atherosclerosis
,
2001
, vol.
156
(pg.
409
-
415
)
48
Weisberg
I
,
Tran
P
,
Christensen
B
,
Sibani
S
,
Rozen
R
.
,
A second genetic polymorphism in methylenetetrahydrofolate reductase (MTHFR) associated with decreased enzyme activity.
,
Mol Genet Metab
,
1998
, vol.
64
(pg.
169
-
172
)
49
van der Put
NM
,
Gabreels
F
,
Stevens
EM
, et al.
,
A second common mutation in the methylenetetrahydrofolate reductase gene: an additional risk factor for neural-tube defects?
,
Am J Hum Genet
,
1998
, vol.
62
(pg.
1044
-
1051
)
50
Lievers
KJ
,
Boers
GH
,
Verhoef
P
, et al.
,
A second common variant in the methylenetetrahydrofolate reductase (MTHFR) gene and its relationship to MTHFR enzyme activity, homocysteine, and cardiovascular disease risk.
,
J Mol Med
,
2001
, vol.
79
(pg.
522
-
528
)
51
Souto
JC
,
Blanco-Vaca
F
,
Soria
JM
, et al.
,
A genomewide exploration suggests a new candidate gene at chromosome 11q23 as the major determinant of plasma homocysteine levels: results from the GAIT project.
,
Am J Hum Genet
,
2005
, vol.
76
(pg.
925
-
933
)
52
Roessler
M
,
Rollinger
W
,
Palme
S
, et al.
,
Identification of nicotinamide N-methyltransferase as a novel serum tumor marker for colorectal cancer.
,
Clin Cancer Res
,
2005
, vol.
11
(pg.
6550
-
6557
)
53
Sartini
D
,
Santarelli
A
,
Rossi
V
, et al.
,
Nicotinamide N-methyltransferase upregulation inversely correlates with lymph node metastasis in oral squamous cell carcinoma.
,
Mol Med
,
2007
, vol.
13
(pg.
415
-
421
)
54
Rots
MG
,
Pieters
R
,
Peters
GJ
, et al.
,
Role of folylpolyglutamate synthetase and folylpolyglutamate hydrolase in methotrexate accumulation and polyglutamylation in childhood leukemia.
,
Blood
,
1999
, vol.
93
(pg.
1677
-
1683
)
Sign in via your Institution